Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

523

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Spring and wire product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0178 #02 Y:2010 Utilize higher efficiency lamps and/or ballasts $1,297 $244
IC0178 #01 Y:2010 Utilize higher efficiency lamps and/or ballasts $4,221 $14,399
LE0277 #10 Y:2008 Install occupancy sensors $755 $60
LE0277 #09 Y:2008 Utilize higher efficiency lamps and/or ballasts $3,555 $3,555
LE0277 #08 Y:2008 Use solar heat to heat water $354 $1,260
LE0277 #07 Y:2008 Install compressor air intakes in coolest locations $884 $800
LE0277 #06 Y:2008 Reschedule plant operations or reduce load to avoid peaks $2,194 $2,500
LE0277 #05 Y:2008 Reduce the pressure of compressed air to the minimum required $2,432 $200
LE0277 #04 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $2,656 $130
LE0277 #03 Y:2008 Use / purchase optimum sized compressor $3,444 $500
LE0277 #02 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $11,354 $15,000
LE0277 #01 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $12,555 $1,000
IC0142 #15 Y:2008 Utilize higher efficiency lamps and/or ballasts $5,846 $11,800
IC0142 #14 Y:2008 Use insulation in furnaces to facilitate heating / cooling $2,835 $16,294
IC0142 #13 Y:2008 Lower temperature during the winter season and vice-versa $1,171 -
IC0142 #12 Y:2008 Install occupancy sensors $711 $1,402
IC0142 #11 Y:2008 Use most efficient type of electric motors $734 $5,429
IC0142 #10 Y:2008 Utilize energy-efficient belts and other improved mechanisms $2,501 -
IC0142 #09 Y:2008 Use or replace with energy efficient substitutes $482 -
IC0142 #08 Y:2008 Utilize higher efficiency lamps and/or ballasts $90 $203