ITAC Assessment: LE0277
ITAC logo
ITAC Assessment: LE0277
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Equipment used for biomedical research
NAICS 332618: Other Fabricated Wire Product Manufacturing
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $100
M
to 500
M
# of Employees 365
Plant Area 196,000
ft2
Annual Production 1
units
Production Hrs. Annual 4,160
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $228,931 2,289,631
kWh
Electricity Demand $43,917 6,688
kW-mo/yr
Natural Gas $17,355 1,104
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,183 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,555 $1,000 $10,555
105,548
kWh
$2,000
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,354 $15,000 $9,545
95,448
kWh
$1,809
-
kW-mo/yr
03 2.4226: Use / purchase optimum sized compressor $3,444 $500 $2,566
25,655
kWh
$878
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,656 $130 $2,656
26,564
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,432 $200 $2,009
20,094
kWh
$423
-
kW-mo/yr
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,194 $2,500 - $2,194
-
kW-mo/yr
07 2.4221: Install compressor air intakes in coolest locations $884 $800 $727
7,273
kWh
$157
-
kW-mo/yr
08 2.9112: Use solar heat to heat water $354 $1,260 $354
3,543
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $3,555 $3,555 $3,006
30,060
kWh
$549
-
kW-mo/yr
10 2.7135: Install occupancy sensors $755 $60 $755
7,550
kWh
-
TOTAL RECOMMENDED $40,183 $25,005 $32,173
321,735
kWh
$8,010
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings