Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

139

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Power boiler and heat exchanger manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2316 #06 Y:2023 Install occupancy sensors $460 $753
LS2316 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $47,296 $25,200
LS2316 #04 Y:2023 Use photocell controls $1,069 $370
LS2316 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $33,726 $4,515
LS2316 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,894 $135
LS2316 #01 Y:2023 Install timers and/or thermostats $3,030 $30
TT0300 #11 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,868 $1,965
TT0300 #10 Y:2023 Upgrade controls on compressors $8,509 $17,500
TT0300 #09 Y:2023 Reduce the pressure of compressed air to the minimum required $8,809 $156
TT0300 #08 Y:2023 Utilize higher efficiency lamps and/or ballasts $10,614 $19,910
TT0300 #07 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $12,049 $13,500
TT0300 #06 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $14,078 $18,500
TT0300 #05 Y:2023 Recover waste heat from equipment $18,281 $13,000
TT0300 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $20,075 $30,000
TT0300 #03 Y:2023 Optimize plant power factor $22,385 $37,500
TT0300 #02 Y:2023 Begin a practice of predictive / preventative maintenance $41,095 $32,000
TT0300 #01 Y:2023 Use solar heat to make electricty $46,047 $221,715
OK1062 #05 Y:2021 Utilize higher efficiency lamps and/or ballasts $10,957 $30,186
OK1062 #04 Y:2021 Replace existing hvac unit with high efficiency model $101 $580
OK1062 #03 Y:2021 Use radiant heater for spot heating $12,930 $48,590