ITAC Assessment: OK1062
ITAC logo
ITAC Assessment: OK1062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product heat exchangers
NAICS 332410: Power Boiler and Heat Exchanger Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 70,000
ft2
Annual Production 3,000
units
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,311 647,300
kWh
Electricity Demand $27,880 3,319
kW-mo/yr
Natural Gas $32,695 12,117
MMBtu
Waste Disposal Costs
Water Usage $4,361 765
Tgal
TOTAL YEARLY COSTS $110,247
RECOMMENDED SAVINGS* $29,836 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,906

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,294 $2,732 $3,294
47,056
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,554 - $2,554
36,484
kWh
- -
03 2.7231: Use radiant heater for spot heating $12,930 $48,590 - - $12,930
-
MMBtu
04 2.7232: Replace existing hvac unit with high efficiency model $101 $580 $40
568
kWh
$61
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $10,957 $30,186 $6,784
96,918
kWh
$4,173
-
kW-mo/yr
-
TOTAL RECOMMENDED $29,836 $82,088 $12,672
181,026
kWh
$4,234
-
kW-mo/yr
$12,930
-
MMBtu
TOTAL IMPLEMENTED $16,906 $33,498 $12,672
181,026
kWh
$4,234
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs