| Assessment Year | 2022 |
|---|---|
| Principal Product | heat exchangers |
| NAICS | 332410: Power Boiler and Heat Exchanger Manufacturing |
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
70,000
ft2
|
| Annual Production | 3,000
units
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $45,311 | 647,300 |
kWh
|
$0.070 | |
| Electricity Demand | $27,880 | 3,319 |
kW-mo/yr
|
$8.40 | |
| Natural Gas | $32,695 | 12,117 |
MMBtu
|
$2.70 | |
| Waste Disposal Costs | |||||
| Water Usage | $4,361 | 765 |
Tgal
|
$5.70 | |
| TOTAL YEARLY COSTS | $110,247 | ||||
| RECOMMENDED SAVINGS* | $29,836 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $16,906 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,294 | $2,732 |
$3,294
47,056
kWh
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,554 | - |
$2,554
36,484
kWh
|
- | - | |
| 03 | 2.7231: Use radiant heater for spot heating | $12,930 | $48,590 | - | - |
$12,930
-
MMBtu
|
|
| 04 | 2.7232: Replace existing hvac unit with high efficiency model | $101 | $580 |
$40
568
kWh
|
$61
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,957 | $30,186 |
$6,784
96,918
kWh
|
$4,173
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $29,836 | $82,088 |
$12,672
181,026
kWh
|
$4,234
-
kW-mo/yr
|
$12,930
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $16,906 | $33,498 |
$12,672
181,026
kWh
|
$4,234
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs