ITAC Assessment: IC0141
ITAC logo
ITAC Assessment: IC0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Pharmaceutical Products
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 180,000
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $956,802 12,535,072
kWh
Other Energy $1,504,839 130,784
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $322,473 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,077

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Other Energy Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $30,325 $6,000 $30,325
397,440
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $21,733 $24,016 $21,733
284,832
kWh
- -
03 2.7135: Install occupancy sensors $23,283 $37,500 $23,283
305,148
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,400 - $1,400
36,603
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,800 $49,250 $23,800
1,252,000
kWh
- -
06 2.4133: Use most efficient type of electric motors $2,794 $14,000 $2,794
36,603
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,000 $11,500 - $10,000 -
08 2.4231: Reduce the pressure of compressed air to the minimum required $15,750 $1,400 - $15,750 -
09 2.2136: Install / repair insulation on steam lines $59,840 $25,152 - - $59,840
-
MMBtu
10 2.2113: Repair or replace steam traps $19,800 $17,250 - - $19,800
-
MMBtu
11 2.7425: Clean or color roof to reduce solar load $113,748 $180,000 $113,748
1,490,100
kWh
- -
TOTAL RECOMMENDED $322,473 $366,068 $217,083
3,802,726
kWh
$25,750 $79,640
-
MMBtu
TOTAL IMPLEMENTED $74,077 $100,166 $48,327
1,573,435
kWh
$25,750 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs