ITAC Assessment: AS0242
ITAC logo
ITAC Assessment: AS0242
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product High purity glass precision assemblies and fiberoptics
NAICS
n/a
SIC 3827: Optical Instruments and Lenses
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 100,000
ft2
Annual Production 32,152
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $195,508 2,775,498
kWh
Electricity Demand $11,750 6,756
kW-mo/yr
Electricity Fees $221,202 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $60,670

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.4133: Use most efficient type of electric motors $297 $398 $221
4,689
kWh
$76
-
kW-mo/yr
- - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $526 $551 $288
5,862
kWh
$52
-
kW-mo/yr
- $90 - $96 -
03 2.7135: Install occupancy sensors $1,628 $2,550 $1,219
25,205
kWh
$409
-
kW-mo/yr
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,416 $15,077 $6,238
128,664
kWh
$2,178
-
kW-mo/yr
- - - - -
05 2.2515: Use optimum thickness insulation $3,847 $383 $3,847
79,426
kWh
- - - - - -
06 2.6218: Turn off equipment when not in use $76 $45 $76
1,465
kWh
- - - - - -
07 3.1293: Separate treatments for each type of solution and recycle $890 $120 - - $890
-
gal
- - - -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $300 $120 - - - - $144 - $156
09 3.6192: Use a less expensive method of waste removal $480 $60 - - - - $480 - -
10 4.112: Replace old machine with new automatic multi-station tool $56,000 $36,200 - - - $56,000 - - -
TOTAL RECOMMENDED $72,460 $55,504 $11,889
245,311
kWh
$2,715
-
kW-mo/yr
$890
-
gal
$56,090 $624 $96 $156
TOTAL IMPLEMENTED $60,670 $37,532 $4,356
89,977
kWh
$128
-
kW-mo/yr
- $56,090 - $96 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs