ITAC Assessment: TT0300
ITAC logo
ITAC Assessment: TT0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Industrial Boilers and Water Heaters
NAICS 332410: Power Boiler and Heat Exchanger Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 460,000
ft2
Annual Production 77,000
units
Production Hrs. Annual 5,616
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $616,788 12,888,600
kWh
Electricity Demand $420,521 33,496
kW-mo/yr
Natural Gas $402,570 39,356
MMBtu
Waste Disposal Costs
Water Usage $56,385 11,400
Tgal
Water Disposal $37,264 4,840
Tgal
TOTAL YEARLY COSTS $1,533,528
RECOMMENDED SAVINGS* $203,810 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Increase in Production Savings
01 2.9114: Use solar heat to make electricty $46,047 $221,715 $46,047
961,313
kWh
- - - -
02 4.611: Begin a practice of predictive / preventative maintenance $41,095 $32,000 - - - - $41,095
03 2.3212: Optimize plant power factor $22,385 $37,500 - - $22,385 - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,075 $30,000 $20,075
419,100
kWh
- - - -
05 2.2437: Recover waste heat from equipment $18,281 $13,000 - - - $18,281
-
MMBtu
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,078 $18,500 $14,078
293,898
kWh
- - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,049 $13,500 $10,168
212,278
kWh
$1,881
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $10,614 $19,910 $5,694
118,882
kWh
$4,920
-
kW-mo/yr
- - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $8,809 $156 $8,809
183,910
kWh
- - - -
10 2.4224: Upgrade controls on compressors $8,509 $17,500 $8,509
177,650
kWh
- - - -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,868 $1,965 $1,868
38,990
kWh
- - - -
TOTAL RECOMMENDED $203,810 $405,746 $115,248
2,406,021
kWh
$6,801
-
kW-mo/yr
$22,385 $18,281
-
MMBtu
$41,095
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Increase in Production Savings