ITAC Assessment: LS2316
ITAC logo
ITAC Assessment: LS2316
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Industrial Services
NAICS 332410: Power Boiler and Heat Exchanger Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 160,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,310 2,120,880
kWh
Electricity Demand $16,534 4,605
kW-mo/yr
TOTAL YEARLY COSTS $243,844
RECOMMENDED SAVINGS* $87,475 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,080

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7261: Install timers and/or thermostats $3,030 $30 $3,030
28,315
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,894 $135 $1,894
17,699
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $33,726 $4,515 $30,911
288,891
kWh
$2,815
-
kW-mo/yr
04 2.7134: Use photocell controls $1,069 $370 $1,069
9,987
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $47,296 $25,200 $47,296
442,016
kWh
-
06 2.7135: Install occupancy sensors $460 $753 $460
4,297
kWh
-
TOTAL RECOMMENDED $87,475 $31,003 $84,660
791,205
kWh
$2,815
-
kW-mo/yr
TOTAL IMPLEMENTED $36,080 $5,403 $33,265
310,887
kWh
$2,815
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs