Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Boiler, tank, and shipping container manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0695 #07 Y:2025 Analyze flue gas for proper air/fuel ratio $4,306 $3,315
WV0695 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,359 $1,140
WV0695 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $4,699 $450
WV0695 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $4,709 $4,792
WV0695 #03 Y:2025 Install compressor air intakes in coolest locations $5,202 $7,240
WV0695 #02 Y:2025 Upgrade controls on compressors $10,999 $24,995
WV0695 #01 Y:2025 Replace existing hvac unit with high efficiency model $19,014 $87,150
UD1059 #07 Y:2023 Utilize energy-efficient belts and other improved mechanisms $403 -
UD1059 #06 Y:2023 Turn off equipment during breaks, reduce operating time $20,047 $800
UD1059 #05 Y:2023 Upgrade conveyors $150,522 $270,472
UD1059 #04 Y:2023 Disconnect ballasts $776 $3,500
UD1059 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $19,947 $14,000
UD1059 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $25,386 $1,200
UD1059 #01 Y:2023 Eliminate or reduce compressed air usage $43,663 $1,000
WV0471 #13 Y:2013 Develop a repair/replace policy $124 $426
WV0471 #12 Y:2013 Disconnect ballasts $297 $70
WV0471 #11 Y:2013 Reduce the pressure of compressed air to the minimum required $716 $105
WV0471 #10 Y:2013 Utilize higher efficiency lamps and/or ballasts $1,159 $4,625
WV0471 #09 Y:2013 Install occupancy sensors $1,731 $680
WV0471 #08 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $1,944 $3,375