Assessment Year | 2023 |
---|---|
Principal Product | Metal Cans |
NAICS | 332431: Metal Can Manufacturing |
SIC | 3411: Metal Cans |
Sales Range | $50 M to 100M |
# of Employees | 175 |
Plant Area |
250,000
ft2
|
Annual Production | 860,470,775
units
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,163,787 | 24,109,411 |
kWh
|
$0.048 | |
Natural Gas | $526,728 | 83,504 |
MMBtu
|
$6.31 | |
Waste Disposal Costs | |||||
Water Usage | $40,000 | 7,800 |
Tgal
|
$5.13 | |
Water Disposal | $40,000 | 7,800 |
Tgal
|
$5.13 | |
TOTAL YEARLY COSTS | $1,770,516 | ||||
RECOMMENDED SAVINGS* | $260,744 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $109,043 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $43,663 | $1,000 |
$43,663
904,003
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $25,386 | $1,200 |
$25,386
525,600
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,947 | $14,000 |
$15,829
327,726
kWh
|
$2,228 | $1,890 | |
04 | 2.7122: Disconnect ballasts | $776 | $3,500 |
$776
16,065
kWh
|
- | - | |
05 | 2.4325: Upgrade conveyors | $150,522 | $270,472 |
$150,522
3,116,408
kWh
|
- | - | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $20,047 | $800 |
$20,047
415,051
kWh
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $403 | - |
$403
8,335
kWh
|
- | - | |
TOTAL RECOMMENDED | $260,744 | $290,972 |
$256,626
5,313,188
kWh
|
$2,228 | $1,890 | ||
TOTAL IMPLEMENTED | $109,043 | $17,000 |
$104,925
2,172,380
kWh
|
$2,228 | $1,890 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs