ITAC Assessment: UD1059
ITAC logo
ITAC Assessment: UD1059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Metal Cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $50
M
to 100
M
# of Employees 175
Plant Area 250,000
ft2
Annual Production 860,470,775
units
Production Hrs. Annual 8,568
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,163,787 24,109,411
kWh
Natural Gas $526,728 83,504
MMBtu
Waste Disposal Costs
Water Usage $40,000 7,800
Tgal
Water Disposal $40,000 7,800
Tgal
TOTAL YEARLY COSTS $1,770,516
RECOMMENDED SAVINGS* $260,744 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $109,043

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $43,663 $1,000 $43,663
904,003
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $25,386 $1,200 $25,386
525,600
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $19,947 $14,000 $15,829
327,726
kWh
$2,228 $1,890
04 2.7122: Disconnect ballasts $776 $3,500 $776
16,065
kWh
- -
05 2.4325: Upgrade conveyors $150,522 $270,472 $150,522
3,116,408
kWh
- -
06 2.6212: Turn off equipment during breaks, reduce operating time $20,047 $800 $20,047
415,051
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $403 - $403
8,335
kWh
- -
TOTAL RECOMMENDED $260,744 $290,972 $256,626
5,313,188
kWh
$2,228 $1,890
TOTAL IMPLEMENTED $109,043 $17,000 $104,925
2,172,380
kWh
$2,228 $1,890
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs