ITAC Assessment: IC0061
ITAC logo
ITAC Assessment: IC0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product 3-Tab Shingles, Shingle Rolls
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area 284,000
ft2
Annual Production 65,000,000
lb
Production Hrs. Annual 6,480
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $154,677 4,691,333
kWh
Electricity Demand $102,670 7,310
kW-mo/yr
Electricity Fees $35,583 -
Natural Gas $151,063 34,726
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,555

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $694 $1,859 $425
10,371
kWh
$269
-
kW-mo/yr
- - -
02 2.1113: Reduce combustion air flow to optimum $3,861 $2,640 - - $3,861
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $20,440 $26,755 $12,978
316,522
kWh
$8,230
-
kW-mo/yr
- $(-587.0) $(-181.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $16,505 $31,380 $9,670
235,870
kWh
$7,797
-
kW-mo/yr
- $(-559.0) $(-403.0)
TOTAL RECOMMENDED $41,500 $62,634 $23,073
562,763
kWh
$16,296
-
kW-mo/yr
$3,861
-
MMBtu
$(-1,146.0) $(-584.0)
TOTAL IMPLEMENTED $4,555 $4,499 $425
10,371
kWh
$269
-
kW-mo/yr
$3,861
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs