Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

582

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Sheet metal work manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CM1037 #08 Y:2024 Modify facility to avoid excess maintenance costs $3,625 $174,405
CM1037 #07 Y:2024 Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $266 $6,707
CM1037 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $148 $250
CM1037 #05 Y:2024 Close holes and openings in building such as broken windows $2,886 $3,371
CM1037 #04 Y:2024 Install compressor air intakes in coolest locations $223 $2,035
CM1037 #03 Y:2024 Replace existing chiller with high efficiency model $1,212 $5,526
CM1037 #02 Y:2024 Use or replace with energy efficient substitutes $23,469 $472,800
CM1037 #01 Y:2024 Use solar heat to make electricty $8,124 $150,694
UC2412 #08 Y:2024 Use solar heat to make electricty $16,427 $124,645
UC2412 #07 Y:2024 Eliminate or reduce compressed air usage $1,217 $900
UC2412 #06 Y:2024 Reduce the pressure of compressed air to the minimum required $511 $225
UC2412 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,630 $1,300
UC2412 #04 Y:2024 Utilize controls to operate equipment only when needed $2,533 $75
UC2412 #03 Y:2024 Change rate schedules or other changes in utility service $6,358 -
UC2412 #02 Y:2024 Pay utility bills on time $247 -
UC2412 #01 Y:2024 Apply for tax-free status for energy purchases $680 -
LE0574 #06 Y:2024 Replace existing equipment with more suitable substitutes $23,968 $911,000
LE0574 #05 Y:2024 Replace existing hvac unit with high efficiency model $14,969 $45,000
LE0574 #04 Y:2024 Use / purchase optimum sized compressor $13,704 $32,395
LE0574 #03 Y:2024 Use or replace with energy efficient substitutes $32,332 $69,375