Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

93

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Metal window and door manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0148 #05 Y:2021 Utilize energy-efficient belts and other improved mechanisms $125 $522
IP0148 #04 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $126 $504
IP0148 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $3,097 $185
IP0148 #02 Y:2021 Turn off equipment when not in use $844 -
IP0148 #01 Y:2021 Conserve energy by efficient use of vending machines $104 -
BD0476 #10 Y:2015 Install compressor air intakes in coolest locations $228 $700
BD0476 #09 Y:2015 Utilize higher efficiency lamps and/or ballasts $304 $280
BD0476 #08 Y:2015 Reduce the pressure of compressed air to the minimum required $384 $45
BD0476 #07 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $629 $300
BD0476 #06 Y:2015 Utilize higher efficiency lamps and/or ballasts $791 $490
BD0476 #05 Y:2015 Install occupancy sensors $1,004 $370
BD0476 #04 Y:2015 Adjust / maintain fork lift trucks for most efficient operation $4,708 $3,000
BD0476 #03 Y:2015 Utilize higher efficiency lamps and/or ballasts $1,120 $700
BD0476 #02 Y:2015 Use most efficient type of electric motors $1,201 $1,400
BD0476 #01 Y:2015 Improve combustion control capability $8,263 $15,000
BD0475 #15 Y:2015 Eliminate old stock and modify inventory control $2,000 $500
BD0475 #14 Y:2015 Convert to electrostatic powder coating $28,428 $90,000
BD0475 #13 Y:2015 Utilize energy-efficient belts and other improved mechanisms $131 $150
BD0475 #12 Y:2015 Reduce the pressure of compressed air to the minimum required $363 $20
BD0475 #11 Y:2015 Utilize higher efficiency lamps and/or ballasts $456 $375