Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,173

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Ornamental and architectural metal products manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0449 #06 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $21,369 $10,437
MS0449 #05 Y:2025 Recover and reuse waste material $24,000 $14,060
MS0449 #04 Y:2025 Air condition only space necessary $11,235 $15,450
MS0449 #03 Y:2025 Upgrade obsolete equipment $10,000 $18,185
MS0449 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,428 $5,389
MS0449 #01 Y:2025 Install replacement doors $13,143 $8,336
MU0066 #09 Y:2025 Use solar heat to make electricty $59,971 $561,792
MU0066 #08 Y:2025 Use proper thickness of insulation on building envelope $116 $193
MU0066 #07 Y:2025 Use proper thickness of insulation on building envelope $251 $242
MU0066 #06 Y:2025 Install vinyl strip / high speed / air curtain doors $4,303 $4,440
MU0066 #05 Y:2025 Close holes and openings in building such as broken windows $189 $627
MU0066 #04 Y:2025 Replace existing hvac unit with high efficiency model $49,773 $560,225
MU0066 #03 Y:2025 Use photocell controls $302 $550
MU0066 #02 Y:2025 Use separate switches on perimeter lighting which may be turned off when natural light is available $762 $362
MU0066 #01 Y:2025 Turn off equipment when not in use $226 -
OK1138 #07 Y:2025 Utilize controls to operate equipment only when needed $4,338 $893
OK1138 #06 Y:2025 Insulate bare equipment $488 $653
OK1138 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $41,839 $132,837
OK1138 #04 Y:2025 Recover waste heat from equipment $1,934 $20
OK1138 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $3,561 $1,950