1,209
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
WV0691 #12 Y:2025 | 12 | 2025 | Reduce the pressure of compressed air to the minimum required | $307 | $74 |
n/a
|
WV0691 #11 Y:2025 | 11 | 2025 | Eliminate or reduce compressed air usage | $499 | $1,904 |
n/a
|
WV0691 #10 Y:2025 | 10 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $803 | $1,648 |
n/a
|
WV0691 #09 Y:2025 | 09 | 2025 | Install compressor air intakes in coolest locations | $988 | $3,325 |
n/a
|
WV0691 #08 Y:2025 | 08 | 2025 | Utilize controls to operate equipment only when needed | $1,158 | $1,551 |
n/a
|
WV0691 #07 Y:2025 | 07 | 2025 | Establish a predictive maintenance program | $1,258 | $5,200 |
n/a
|
WV0691 #06 Y:2025 | 06 | 2025 | Utilize higher efficiency lamps and/or ballasts | $2,748 | $5,805 |
n/a
|
WV0691 #05 Y:2025 | 05 | 2025 | Install outside air damper / economizer on hvac unit | $3,361 | $8,020 |
n/a
|
WV0691 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,884 | $791 |
n/a
|
WV0691 #03 Y:2025 | 03 | 2025 | Upgrade controls on compressors | $4,889 | $2,661 |
n/a
|
WV0691 #02 Y:2025 | 02 | 2025 | Utilize higher efficiency lamps and/or ballasts | $23,407 | $43,263 |
n/a
|
WV0691 #01 Y:2025 | 01 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $35,475 | $103,505 |
n/a
|
NL0116 #06 Y:2025 | 06 | 2025 | Utilize higher efficiency lamps and/or ballasts | $411 | $423 |
n/a
|
NL0116 #05 Y:2025 | 05 | 2025 | Insulate bare equipment | $566 | $655 |
n/a
|
NL0116 #04 Y:2025 | 04 | 2025 | Install compressor air intakes in coolest locations | $828 | $4,650 |
n/a
|
NL0116 #03 Y:2025 | 03 | 2025 | Apply for tax-free status for energy purchases | $5,745 | $2,300 |
n/a
|
NL0116 #02 Y:2025 | 02 | 2025 | Separate and recycle scrap metal to foundry or for sale | $13,580 | $600 |
n/a
|
NL0116 #01 Y:2025 | 01 | 2025 | Improve air circulation with destratification fans / other methods | $45,419 | $54,600 |
n/a
|
UD1117 #06 Y:2025 | 06 | 2025 | Recover waste heat from equipment | $1,029 | $4,975 |
n/a
|
UD1117 #05 Y:2025 | 05 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $8,113 | - |
n/a
|