Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Fabricated structural metal manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0266 #07 Y:2025 Optimize plant power factor $8,550 $22,000
UU0266 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $633 $543
UU0266 #05 Y:2025 Eliminate or reduce compressed air usage $5,730 $6,960
UU0266 #04 Y:2025 Use / purchase optimum sized compressor $15,500 $38,200
UU0266 #03 Y:2025 Replace fossil fuel equipment with electrical equipment $52,801 $18,500
UU0266 #02 Y:2025 Use radiant heater for spot heating $8,217 $13,000
UU0266 #01 Y:2025 Replace existing hvac unit with high efficiency model $15,681 $22,500
UU0120 #09 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $1,929 -
UU0120 #08 Y:2017 Optimize plant power factor $3,894 $3,500
UU0120 #07 Y:2017 Install common header on compressors $4,024 $5,000
UU0120 #06 Y:2017 Reduce the pressure of compressed air to the minimum required $6,227 $410
UU0120 #05 Y:2017 Purchase gas directly from a contract gas supplier $6,334 $400
UU0120 #04 Y:2017 Upgrade controls on compressors $12,184 $800
UU0120 #03 Y:2017 Insulate bare equipment $32,948 $23,006
UU0120 #02 Y:2017 Utilize higher efficiency lamps and/or ballasts $35,587 $61,481
UU0120 #01 Y:2017 Convert to air assisted / airless paint guns $113,750 $5,600
UU0058 #08 Y:2003 Turn off equipment during breaks, reduce operating time $584 -
UU0058 #07 Y:2003 Combine utility meters $10,270 -
UU0058 #06 Y:2003 Reschedule plant operations or reduce load to avoid peaks $14,353 -
UU0058 #05 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $2,714 $1,010