Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,227

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Plate work and fabricated structural product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2202 #06 Y:2022 Use solar heat to make electricty $50,126 $1,220,427
UL2202 #05 Y:2022 Optimize plant power factor $16,897 $12,250
UL2202 #04 Y:2022 Reduce the pressure of compressed air to the minimum required $649 -
UL2202 #03 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $4,677 -
UL2202 #02 Y:2022 Utilize higher efficiency lamps and/or ballasts $6,861 $12,941
UL2202 #01 Y:2022 Change rate schedules or other changes in utility service $23,158 -
MI0402 #07 Y:2022 Use compressor air filters $934 $580
MI0402 #06 Y:2022 Eliminate or reduce compressed air usage $3,196 $5,530
MI0402 #05 Y:2022 Utilize higher efficiency lamps and/or ballasts $2,039 $5,244
MI0402 #04 Y:2022 Eliminate or reduce compressed air usage $3,047 $2,100
MI0402 #03 Y:2022 Clean or color roof to reduce solar load $3,485 $12,386
MI0402 #02 Y:2022 Lower temperature during the winter season and vice-versa $3,776 $580
MI0402 #01 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $6,050 $1,980
LS2202 #10 Y:2021 Use solar heat to make electricty $46,737 $646,020
LS2202 #09 Y:2021 Optimize plant power factor $12,415 $106,570
LS2202 #08 Y:2021 Use or replace with energy efficient substitutes $25,733 $189,000
LS2202 #07 Y:2021 Utilize higher efficiency lamps and/or ballasts $6,379 $6,434
LS2202 #06 Y:2021 Make a practice of turning off lights when not needed $478 $300
LS2202 #05 Y:2021 Install occupancy sensors $448 $200
LS2202 #04 Y:2021 Use photocell controls $2,098 $555