ITAC Assessment: LS2202
ITAC logo
ITAC Assessment: LS2202
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Metal Fabrication
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range less than $500
k
# of Employees 200
Plant Area 35,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,496
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $783,598 7,363,048
kWh
Electricity Demand $4,103 1,000
kW-mo/yr
Natural Gas $19,591 3,511
MMBtu
Waste Disposal Costs
Water Usage $52,934 10,410
Tgal
TOTAL YEARLY COSTS $860,226
RECOMMENDED SAVINGS* $118,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7261: Install timers and/or thermostats $6,914 $63 $6,914
64,969
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $7,397 $100 $7,397
69,506
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,320 $900 $10,320
96,972
kWh
- -
04 2.7134: Use photocell controls $2,098 $555 $2,098
19,710
kWh
- -
05 2.7135: Install occupancy sensors $448 $200 $448
4,210
kWh
- -
06 2.7124: Make a practice of turning off lights when not needed $478 $300 $478
4,492
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,379 $6,434 $5,379
50,548
kWh
$1,000
-
kW-mo/yr
-
08 2.4322: Use or replace with energy efficient substitutes $25,733 $189,000 $25,733
241,795
kWh
- -
09 2.3212: Optimize plant power factor $12,415 $106,570 - - $12,415
10 2.9114: Use solar heat to make electricty $46,737 $646,020 $46,737
439,165
kWh
- -
TOTAL RECOMMENDED $118,919 $950,142 $105,504
991,367
kWh
$1,000
-
kW-mo/yr
$12,415
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs