Assessment Year | 1996 |
---|---|
Principal Product | buoys |
NAICS |
n/a
|
SIC | 3299: Nonmetallic Mineral Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 45 |
Plant Area |
100,000
ft2
|
Annual Production | 12,500,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $93,132 | 1,515,533 |
kWh
|
$0.061 |
Electricity Demand | $52,555 | 3,488 |
kW-mo/yr
|
$15.07 |
Fuel Oil #4 | $223,416 | 52,200 |
MMBtu
|
$4.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,682 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #4 Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7293: Install dry sprinkler system or other method to reduce heating requirements | $9,520 | $17,800 | - | - |
$9,520
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,359 | $13,344 |
$6,226
70,926
kWh
|
$133
-
kW-mo/yr
|
- | - | |
03 | 3.8132: Use less toxic and volatile solvent substitutes | $5,436 | $6,000 | - | - | - |
$5,436
-
gal
|
|
04 | 2.7135: Install occupancy sensors | $933 | $1,440 |
$933
14,947
kWh
|
- | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $830 | - |
$830
8,499
kWh
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $604 | $350 |
$604
9,672
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $23,682 | $38,934 |
$8,593
104,044
kWh
|
$133
-
kW-mo/yr
|
$9,520
-
MMBtu
|
$5,436
-
gal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #4 Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs