ITAC Assessment: MA0359
ITAC logo
ITAC Assessment: MA0359
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product buoys
NAICS
n/a
SIC 3299: Nonmetallic Mineral Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 100,000
ft2
Annual Production 12,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,132 1,515,533
kWh
Electricity Demand $52,555 3,488
kW-mo/yr
Fuel Oil #4 $223,416 52,200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,682 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #4 Savings Other Liquid (haz) Savings
01 2.7293: Install dry sprinkler system or other method to reduce heating requirements $9,520 $17,800 - - $9,520
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,359 $13,344 $6,226
70,926
kWh
$133
-
kW-mo/yr
- -
03 3.8132: Use less toxic and volatile solvent substitutes $5,436 $6,000 - - - $5,436
-
gal
04 2.7135: Install occupancy sensors $933 $1,440 $933
14,947
kWh
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $830 - $830
8,499
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $604 $350 $604
9,672
kWh
- - -
TOTAL RECOMMENDED $23,682 $38,934 $8,593
104,044
kWh
$133
-
kW-mo/yr
$9,520
-
MMBtu
$5,436
-
gal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #4 Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs