ITAC Assessment: UL2202
ITAC logo
ITAC Assessment: UL2202
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Industrial metal products
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 172,000
ft2
Annual Production 19,200,000
lb
Production Hrs. Annual 4,550
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,983 3,789,600
kWh
Electricity Demand $205,866 10,678
kW-mo/yr
Electricity Fees $41,363 -
Natural Gas $20,573 2,415
MMBtu
TOTAL YEARLY COSTS $387,785
RECOMMENDED SAVINGS* $109,804 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,637

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.8114: Change rate schedules or other changes in utility service $23,158 - - - $23,158
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,861 $12,941 $2,650
82,827
kWh
$4,211
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,677 - $4,677
146,146
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $649 - $649
20,279
kWh
- -
05 2.3212: Optimize plant power factor $16,897 $12,250 - - $16,897
06 2.9114: Use solar heat to make electricty $50,126 $1,220,427 $50,126
1,566,448
kWh
- -
07 2.4151: Develop a repair/replace policy $495 $4,750 $495
15,454
kWh
- -
08 2.3132: Recharge batteries on during off-peak demand periods $6,941 - - $6,941
-
kW-mo/yr
-
TOTAL RECOMMENDED $109,804 $1,250,368 $58,597
1,831,154
kWh
$11,152
-
kW-mo/yr
$40,055
TOTAL IMPLEMENTED $41,637 $12,941 $7,327
228,973
kWh
$11,152
-
kW-mo/yr
$23,158
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs