ITAC Assessment: MI0402
ITAC logo
ITAC Assessment: MI0402
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Metal Stamping and sheets
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 74,000
ft2
Annual Production 60,000
pieces
Production Hrs. Annual 5,772
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,669 957,600
kWh
Electricity Demand $37,278 3,210
kW-mo/yr
Electricity Fees $16,164 -
TOTAL YEARLY COSTS $109,111
RECOMMENDED SAVINGS* $22,527 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,070

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,050 $1,980 $4,273
73,671
kWh
$1,777
-
kW-mo/yr
02 2.7221: Lower temperature during the winter season and vice-versa $3,776 $580 $2,452
42,277
kWh
$1,324
-
kW-mo/yr
03 2.7425: Clean or color roof to reduce solar load $3,485 $12,386 $2,405
41,460
kWh
$1,080
-
kW-mo/yr
04 2.4239: Eliminate or reduce compressed air usage $3,047 $2,100 $2,153
37,125
kWh
$894
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,039 $5,244 $1,331
22,950
kWh
$708
-
kW-mo/yr
06 2.4239: Eliminate or reduce compressed air usage $3,196 $5,530 $2,255
38,887
kWh
$941
-
kW-mo/yr
07 2.4227: Use compressor air filters $934 $580 $597
10,297
kWh
$337
-
kW-mo/yr
TOTAL RECOMMENDED $22,527 $28,400 $15,466
266,667
kWh
$7,061
-
kW-mo/yr
TOTAL IMPLEMENTED $12,070 $9,904 $8,354
144,043
kWh
$3,716
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs