1,063
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
NT0035 #05 Y:2024 | 05 | 2024 | Apply for investment incentives | $7,352 | $5,000 |
n/a
|
NT0035 #04 Y:2024 | 04 | 2024 | Use / purchase optimum sized compressor | $150,000 | $38,900 |
n/a
|
NT0035 #03 Y:2024 | 03 | 2024 | Install adequate dryers on air lines to eliminate blowdown | $1,000 | $5,300 |
n/a
|
NT0035 #02 Y:2024 | 02 | 2024 | Reduce the pressure of compressed air to the minimum required | $954 | - |
n/a
|
NT0035 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,196 | $5,609 |
n/a
|
MS0435 #05 Y:2024 | 05 | 2024 | Optimize plant power factor | $609 | $2,713 |
n/a
|
MS0435 #04 Y:2024 | 04 | 2024 | Change rate schedules or other changes in utility service | $3,222 | - |
n/a
|
MS0435 #03 Y:2024 | 03 | 2024 | Replace fossil fuel equipment with electrical equipment | $10,911 | $100,000 |
n/a
|
MS0435 #02 Y:2024 | 02 | 2024 | Use solar heat to make electricty | $101,423 | $659,750 |
n/a
|
MS0435 #01 Y:2024 | 01 | 2024 | Install timers on light switches in little used areas | $37,679 | $1,527 |
n/a
|
WV0666 #06 Y:2024 | 06 | 2024 | Reduce the pressure of compressed air to the minimum required | $84 | $100 |
n/a
|
WV0666 #05 Y:2024 | 05 | 2024 | Utilize controls to operate equipment only when needed | $260 | $640 |
n/a
|
WV0666 #04 Y:2024 | 04 | 2024 | Develop a repair/replace policy | $445 | $1,367 |
n/a
|
WV0666 #03 Y:2024 | 03 | 2024 | Upgrade controls on compressors | $859 | $3,565 |
n/a
|
WV0666 #02 Y:2024 | 02 | 2024 | Utilize higher efficiency lamps and/or ballasts | $5,679 | $5,920 |
n/a
|
WV0666 #01 Y:2024 | 01 | 2024 | Recycle air for heating, ventilation and air conditioning | $11,346 | $19,500 |
n/a
|
AM0927 #05 Y:2024 | 05 | 2024 | Use synthetic lubricant | $295 | $166 |
n/a
|
AM0927 #04 Y:2024 | 04 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $841 | $166 |
n/a
|
AM0927 #03 Y:2024 | 03 | 2024 | Optimize plant power factor | $5,300 | $8,620 |
n/a
|
AM0927 #02 Y:2024 | 02 | 2024 | Redesign process | $7,085 | $34,585 |
n/a
|