Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,533

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Architectural and structural metals manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0274 #12 Y:2026 Replace boiler $1,260 $7,000
DL0274 #11 Y:2026 Recover heat from exhausted steam, hot air or hot water $6,370 $2,000
DL0274 #10 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,035 $8,000
DL0274 #09 Y:2026 Utilize higher efficiency lamps and/or ballasts $11,772 $8,106
DL0274 #08 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $5,954 $2,500
DL0274 #07 Y:2026 Utilize controls to operate equipment only when needed $657 $320
DL0274 #06 Y:2026 Install waste heat boiler to provide direct power $23 $2,200
DL0274 #05 Y:2026 Use radiant heater for spot heating $8,910 $35,000
DL0274 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $4,336 $19,500
DL0274 #03 Y:2026 Change procedures / equipment / operating conditions $3,224 -
DL0274 #02 Y:2026 Recover waste heat from equipment $2,358 $1,000
DL0274 #01 Y:2026 Recover waste heat from equipment $803 -
DL0273 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,260 $3,400
DL0273 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $57,406 $206,000
DL0273 #03 Y:2026 Replace boiler $6,936 $20,000
DL0273 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $3,416 -
DL0273 #01 Y:2026 Insulate glazing, walls, ceilings, and roofs $36,047 $247,000
NT0063 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $10,825 $5,753
NT0063 #05 Y:2026 Apply for tax-free status for energy purchases $11,337 $5,000
NT0063 #04 Y:2026 Install equipment to move product $42,394 $35,000