Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,517

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Architectural and structural metals manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0063 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $10,825 $5,753
NT0063 #05 Y:2026 Apply for tax-free status for energy purchases $11,337 $5,000
NT0063 #04 Y:2026 Install equipment to move product $42,394 $35,000
NT0063 #03 Y:2026 Replace existing equipment with more suitable substitutes $42,469 $115,600
NT0063 #02 Y:2026 Use optimum size and capacity equipment $140,056 $1,200
NT0063 #01 Y:2026 Replace fossil fuel equipment with electrical equipment $170,396 $896,000
UC2605 #09 Y:2026 Use photocell controls $706 $1,800
UC2605 #08 Y:2026 Install occupancy sensors $607 $1,560
UC2605 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $10,941 $68,400
UC2605 #06 Y:2026 Install occupancy sensors $7,251 $9,750
UC2605 #05 Y:2026 Reduce the pressure of compressed air to the minimum required $4,118 -
UC2605 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,857 $1,560
UC2605 #03 Y:2026 Pay utility bills on time $754 -
UC2605 #02 Y:2026 Apply for tax-free status for energy purchases $21,532 -
UC2605 #01 Y:2026 Optimize plant power factor $25,923 $14,733
OK1168 #10 Y:2026 Pay utility bills on time $33,366 -
OK1168 #09 Y:2026 Install compressor air intakes in coolest locations $41,364 $3,030
OK1168 #08 Y:2026 Recover waste heat from equipment $13,393 $400
OK1168 #07 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $46,838 $23,792
OK1168 #06 Y:2026 Optimize plant power factor $26,193 $97,774