Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Cutlery and handtool manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0356 #09 Y:2004 Recycle fluorescent lamps - $3,496
UF0356 #08 Y:2004 Utilize higher efficiency lamps and/or ballasts $96 $245
UF0356 #07 Y:2004 Install occupancy sensors $1,232 $1,450
UF0356 #06 Y:2004 Utilize higher efficiency lamps and/or ballasts $1,295 $2,194
UF0356 #05 Y:2004 Lower light fixtures in high ceiling areas $2,918 $1,185
UF0356 #04 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $3,008 $700
UF0356 #03 Y:2004 Utilize a less expensive cooling method $6,348 $2,000
UF0356 #02 Y:2004 Install vinyl strip / high speed / air curtain doors $11,843 $21,108
UF0356 #01 Y:2004 Make ice during off peak hours for cooling - $150,000
IC0090 #06 Y:2004 Utilize higher efficiency lamps and/or ballasts $9,205 $30,427
IC0090 #05 Y:2004 Utilize energy-efficient belts and other improved mechanisms $559 $77
IC0090 #04 Y:2004 Eliminate or reduce compressed air usage $2,643 $9,400
IC0090 #03 Y:2004 Reduce the pressure of compressed air to the minimum required $6,932 $425
IC0090 #02 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $3,918 $300
IC0090 #01 Y:2004 Reduce combustion air flow to optimum $17,317 -
WV0298 #13 Y:2004 Reduce illumination to minimum necessary levels $461 $360
WV0298 #12 Y:2004 Analyze flue gas for proper air/fuel ratio $565 $1,000
WV0298 #11 Y:2004 Install compressor air intakes in coolest locations $762 $750
WV0298 #10 Y:2004 Use waste heat from hot flue gases to preheat $794 $1,825
WV0298 #09 Y:2004 Develop a repair/replace policy $736 $705