ITAC Assessment: WV0298
ITAC logo
ITAC Assessment: WV0298
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Off highway and Industrial braking systems
NAICS 332216: Saw Blade and Handtool Manufacturing
SIC 3417:
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 58,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 6,422
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,267 1,239,200
kWh
Natural Gas $21,153 2,734
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,250 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,516

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $3,459 $2,100 - $3,459
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,929 $440 $2,929
42,830
kWh
- -
03 2.4151: Develop a repair/replace policy $2,864 $1,928 $2,864
41,840
kWh
- -
04 2.4322: Use or replace with energy efficient substitutes $2,447 $220 $2,447
35,604
kWh
- -
05 2.2511: Insulate bare equipment $2,066 $1,286 $2,066
30,179
kWh
- -
06 2.6212: Turn off equipment during breaks, reduce operating time $1,986 - $1,986
29,007
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,877 $240 $1,877
27,423
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,304 - $1,304
18,932
kWh
- -
09 2.4151: Develop a repair/replace policy $736 $705 $1,096
21,389
kWh
- $(-360.0)
10 2.2414: Use waste heat from hot flue gases to preheat $794 $1,825 - $794
-
MMBtu
-
11 2.4221: Install compressor air intakes in coolest locations $762 $750 $762
11,171
kWh
- -
12 2.1233: Analyze flue gas for proper air/fuel ratio $565 $1,000 - $565
-
MMBtu
-
13 2.7111: Reduce illumination to minimum necessary levels $461 $360 $461
6,846
kWh
- -
TOTAL RECOMMENDED $22,250 $10,854 $17,792
265,221
kWh
$4,818
-
MMBtu
$(-360.0)
TOTAL IMPLEMENTED $10,516 $2,715 $10,876
164,195
kWh
- $(-360.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs