| Assessment Year | 2023 |
|---|---|
| Principal Product | Commercial offset, small letter, and digital printing. Wide format printing |
| NAICS | 323111: Commercial Printing (except Screen and Books) |
| SIC | 2752: Commercial Printing, Lithographic |
| Sales Range | $10 M to 50M |
| # of Employees | 85 |
| Plant Area |
40,000
ft2
|
| Annual Production | 500,000,000
units
|
| Production Hrs. Annual | 6,783
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $38,010 | 881,899 |
kWh
|
$0.043 |
| Electricity Demand | $33,001 | 4,125 |
kW-mo/yr
|
$8.00 |
| Electricity Fees | $43,551 | - |
|
- |
| Natural Gas | $10,855 | 1,026 |
MMBtu
|
$10.58 |
| TOTAL YEARLY COSTS | $125,417 | |||
| RECOMMENDED SAVINGS* | $26,987 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7135: Install occupancy sensors | $227 | $344 |
$227
5,261
kWh
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,231 | - |
$1,779
41,273
kWh
|
$452
-
kW-mo/yr
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,732 | $2,080 |
$3,772
87,512
kWh
|
$960
-
kW-mo/yr
|
- | |
| 04 | 2.4226: Use / purchase optimum sized compressor | $9,916 | $6,000 |
$7,906
183,437
kWh
|
$2,010
-
kW-mo/yr
|
- | |
| 05 | 2.3212: Optimize plant power factor | $9,881 | $14,306 | - | - | $9,881 | |
| TOTAL RECOMMENDED | $26,987 | $22,730 |
$13,684
317,483
kWh
|
$3,422
-
kW-mo/yr
|
$9,881 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs