14
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Metal crown, closure, and other metal stamping (except automotive) | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WI0515 #07 Y:2006 | 07 | 2006 | Reduce the pressure of compressed air to the minimum required | $907 | - | |
| WI0515 #06 Y:2006 | 06 | 2006 | Utilize higher efficiency lamps and/or ballasts | $972 | - | |
| WI0515 #05 Y:2006 | 05 | 2006 | Install compressor air intakes in coolest locations | $1,038 | $1,280 | |
| WI0515 #04 Y:2006 | 04 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,559 | - | |
| WI0515 #03 Y:2006 | 03 | 2006 | Reschedule plant operations or reduce load to avoid peaks | $2,857 | $3,600 | |
| WI0515 #02 Y:2006 | 02 | 2006 | Eliminate shift | $10,200 | - | |
| WI0515 #01 Y:2006 | 01 | 2006 | Utilize higher efficiency lamps and/or ballasts | $23,672 | $64,000 | |
| WI0512 #07 Y:2005 | 07 | 2005 | Install occupancy sensors | $258 | $150 | |
| WI0512 #06 Y:2005 | 06 | 2005 | Recharge batteries on during off-peak demand periods | $843 | $700 | |
| WI0512 #05 Y:2005 | 05 | 2005 | Install compressor air intakes in coolest locations | $3,371 | $3,200 | |
| WI0512 #04 Y:2005 | 04 | 2005 | Automate payroll system | $5,350 | - | |
| WI0512 #03 Y:2005 | 03 | 2005 | Use evaporation to concentrate material | $24,691 | $12,000 | |
| WI0512 #02 Y:2005 | 02 | 2005 | Utilize higher efficiency lamps and/or ballasts | $29,679 | $72,610 | |
| WI0512 #01 Y:2005 | 01 | 2005 | Re-arrange equipment layout to reduce labor costs | $554 | $21,500 |