Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

462

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Metal crown, closure, and other metal stamping (except automotive)
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0586 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $9,340 $49,500
LE0586 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $14,427 $35,960
LE0586 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $6,379 $2,500
LE0586 #02 Y:2024 Install timers and/or thermostats $17,326 $1,600
LE0586 #01 Y:2024 Install occupancy sensors $1,582 $70
TT0306 #10 Y:2023 Turn off equipment during breaks, reduce operating time $494 $1,400
TT0306 #09 Y:2023 Reduce space conditioning during non-working hours $650 $100
TT0306 #08 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $819 $785
TT0306 #07 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $828 $840
TT0306 #06 Y:2023 Reduce the pressure of compressed air to the minimum required $917 $113
TT0306 #05 Y:2023 Install occupancy sensors $1,321 $1,560
TT0306 #04 Y:2023 Turn off equipment during breaks, reduce operating time $3,347 $2,600
TT0306 #03 Y:2023 Treat and reuse rinse waters $3,460 $1,590
TT0306 #02 Y:2023 Apply for tax-free status for energy purchases $4,348 -
TT0306 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $4,784 $3,840
IP0169 #15 Y:2023 Use insulation in furnaces to facilitate heating / cooling $10,836 $47,613
IP0169 #14 Y:2023 Disconnect ballasts $7 $20
IP0169 #13 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $3,020 $7,379
IP0169 #12 Y:2023 Use proper thickness of insulation on building envelope $3,942 $9,196
IP0169 #11 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $3,267 $5,079