155
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Powder metallurgy part manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SD0697 #11 Y:2026 | 11 | 2026 | Replace existing hvac unit with high efficiency model | $3,646 | $11,700 |
n/a
|
| SD0697 #10 Y:2026 | 10 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $125,227 | - |
n/a
|
| SD0697 #09 Y:2026 | 09 | 2026 | Recover waste heat from equipment | $619 | $1,500 |
n/a
|
| SD0697 #08 Y:2026 | 08 | 2026 | Use insulation in furnaces to facilitate heating / cooling | $13,711 | $1,283 |
n/a
|
| SD0697 #07 Y:2026 | 07 | 2026 | Adopt in-house material generation | $117,916 | $464,200 |
n/a
|
| SD0697 #06 Y:2026 | 06 | 2026 | Reduce the pressure of compressed air to the minimum required | $958 | - |
n/a
|
| SD0697 #05 Y:2026 | 05 | 2026 | Use most efficient type of electric motors | $7,546 | $10,147 |
n/a
|
| SD0697 #04 Y:2026 | 04 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $104 | $424 |
n/a
|
| SD0697 #03 Y:2026 | 03 | 2026 | Install direct acting units in place of compressed air pressure system in safety system | $13,526 | $5,200 |
n/a
|
| SD0697 #02 Y:2026 | 02 | 2026 | Use battery storage for demand control | $67,670 | $104,340 |
n/a
|
| SD0697 #01 Y:2026 | 01 | 2026 | Use solar heat to make electricty | $54,912 | $151,135 |
n/a
|
| UC2516 #14 Y:2025 | 14 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,579 | $1,558 |
n/a
|
| UC2516 #13 Y:2025 | 13 | 2025 | Insulate bare equipment | $1,209 | $2,300 |
n/a
|
| UC2516 #12 Y:2025 | 12 | 2025 | Use battery storage for demand control | $6,925 | $26,046 |
n/a
|
| UC2516 #11 Y:2025 | 11 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $9,759 | $2,730 |
n/a
|
| UC2516 #10 Y:2025 | 10 | 2025 | Optimize plant power factor | $25,429 | $32,020 |
n/a
|
| UC2516 #09 Y:2025 | 09 | 2025 | Apply for tax-free status for energy purchases | $4,506 | - |
n/a
|
| UC2516 #08 Y:2025 | 08 | 2025 | Pay utility bills on time | $142 | - |
n/a
|
| UC2516 #07 Y:2025 | 07 | 2025 | Install partitions to reduce size of conditioned space | $1,323 | $3,464 |
n/a
|
| UC2516 #06 Y:2025 | 06 | 2025 | Install timers and/or thermostats | $1,498 | $4,350 |
n/a
|