Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

155

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Powder metallurgy part manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0697 #11 Y:2026 Replace existing hvac unit with high efficiency model $3,646 $11,700
SD0697 #10 Y:2026 Reschedule plant operations or reduce load to avoid peaks $125,227 -
SD0697 #09 Y:2026 Recover waste heat from equipment $619 $1,500
SD0697 #08 Y:2026 Use insulation in furnaces to facilitate heating / cooling $13,711 $1,283
SD0697 #07 Y:2026 Adopt in-house material generation $117,916 $464,200
SD0697 #06 Y:2026 Reduce the pressure of compressed air to the minimum required $958 -
SD0697 #05 Y:2026 Use most efficient type of electric motors $7,546 $10,147
SD0697 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $104 $424
SD0697 #03 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $13,526 $5,200
SD0697 #02 Y:2026 Use battery storage for demand control $67,670 $104,340
SD0697 #01 Y:2026 Use solar heat to make electricty $54,912 $151,135
UC2516 #14 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $9,579 $1,558
UC2516 #13 Y:2025 Insulate bare equipment $1,209 $2,300
UC2516 #12 Y:2025 Use battery storage for demand control $6,925 $26,046
UC2516 #11 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $9,759 $2,730
UC2516 #10 Y:2025 Optimize plant power factor $25,429 $32,020
UC2516 #09 Y:2025 Apply for tax-free status for energy purchases $4,506 -
UC2516 #08 Y:2025 Pay utility bills on time $142 -
UC2516 #07 Y:2025 Install partitions to reduce size of conditioned space $1,323 $3,464
UC2516 #06 Y:2025 Install timers and/or thermostats $1,498 $4,350