| Assessment Year | 2022 |
|---|---|
| Principal Product | Solid metal car parts |
| NAICS | 332117: Powder Metallurgy Part Manufacturing |
| SIC | 3465: Automotive Stampings |
| Sales Range | $50 M to 100M |
| # of Employees | 135 |
| Plant Area |
68,800
ft2
|
| Annual Production | 10,500,000
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $830,311 | 14,542,067 |
kWh
|
$0.057 |
| Electricity Demand | $351,975 | 20,559 |
kW-mo/yr
|
$17.12 |
| Electricity Fees | $2,740 | - |
|
- |
| Natural Gas | $50,179 | 23,768 |
MMBtu
|
$2.11 |
| TOTAL YEARLY COSTS | $1,235,205 | |||
| RECOMMENDED SAVINGS* | $17,039 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,484 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $263 | $210 |
$189
3,159
kWh
|
$74
-
kW-mo/yr
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,317 | $2,520 |
$923
15,363
kWh
|
$1,394
-
kW-mo/yr
|
- | |
| 03 | 2.2211: Use optimum temperature | $168 | - |
$168
2,796
kWh
|
- | - | |
| 04 | 2.6211: Conserve energy by efficient use of vending machines | $2,790 | $580 |
$2,006
33,432
kWh
|
$784
-
kW-mo/yr
|
- | |
| 05 | 3.5313: Increase amount of waste recovered for resale | $11,502 | - | - | - | $11,502 | |
| TOTAL RECOMMENDED | $17,039 | $3,310 |
$3,286
54,750
kWh
|
$2,252
-
kW-mo/yr
|
$11,502 | ||
| TOTAL IMPLEMENTED | $2,484 | $2,520 |
$1,091
18,159
kWh
|
$1,394
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs