ITAC Assessment: MU0008
ITAC logo
ITAC Assessment: MU0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Solid metal car parts
NAICS 332117: Powder Metallurgy Part Manufacturing
SIC 3465: Automotive Stampings
Sales Range $50
M
to 100
M
# of Employees 135
Plant Area 68,800
ft2
Annual Production 10,500,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $830,311 14,542,067
kWh
Electricity Demand $351,975 20,559
kW-mo/yr
Electricity Fees $2,740 -
Natural Gas $50,179 23,768
MMBtu
TOTAL YEARLY COSTS $1,235,205
RECOMMENDED SAVINGS* $17,039 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,484

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $263 $210 $189
3,159
kWh
$74
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,317 $2,520 $923
15,363
kWh
$1,394
-
kW-mo/yr
-
03 2.2211: Use optimum temperature $168 - $168
2,796
kWh
- -
04 2.6211: Conserve energy by efficient use of vending machines $2,790 $580 $2,006
33,432
kWh
$784
-
kW-mo/yr
-
05 3.5313: Increase amount of waste recovered for resale $11,502 - - - $11,502
TOTAL RECOMMENDED $17,039 $3,310 $3,286
54,750
kWh
$2,252
-
kW-mo/yr
$11,502
TOTAL IMPLEMENTED $2,484 $2,520 $1,091
18,159
kWh
$1,394
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs