Assessment Year | 2025 |
---|---|
Principal Product | Powder Metallurgy |
NAICS | 332117: Powder Metallurgy Part Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 23 |
Plant Area |
70,000
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $70,108 | 556,274 |
kWh
|
$0.13 | |
Electricity Demand | $47,116 | 3,359 |
kW-mo/yr
|
$14.03 | |
Electricity Fees | $2,464 | - |
|
- | |
Natural Gas | $30,524 | 2,779 |
MMBtu
|
$10.98 | |
Other Gas | $4,334 | 1 |
MMBtu
|
$4,334.00 | |
Other Energy | $349,950 | 1 |
MMBtu
|
$349,950.00 | |
Waste Disposal Costs | |||||
Water Usage | $2,969 | 436 |
Tgal
|
$6.81 | |
TOTAL YEARLY COSTS | $507,465 | ||||
RECOMMENDED SAVINGS* | $469,956 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Energy Savings |
---|---|---|---|---|---|---|---|
01 | 4.212: Adopt in-house material generation | $349,950 | $1,386,072 | - | - |
$349,950
-
MMBtu
|
|
02 | 2.9114: Use solar heat to make electricty | $35,660 | $280,607 |
$26,936
213,774
kWh
|
$8,724
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $24,870 | $5,200 |
$21,604
171,460
kWh
|
$3,266
-
kW-mo/yr
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $19,096 | $20,568 |
$14,648
116,250
kWh
|
$4,448
-
kW-mo/yr
|
- | |
05 | 2.2511: Insulate bare equipment | $17,211 | $5,150 |
$17,211
136,600
kWh
|
- | - | |
06 | 2.2442: Preheat combustion air with waste heat | $16,338 | $9,000 |
$7,718
61,251
kWh
|
$8,620
-
kW-mo/yr
|
- | |
07 | 2.3132: Recharge batteries on during off-peak demand periods | $3,571 | $40 | - |
$3,571
-
kW-mo/yr
|
- | |
08 | 2.7232: Replace existing hvac unit with high efficiency model | $2,103 | $2,000 |
$2,103
16,688
kWh
|
- | - | |
09 | 2.7135: Install occupancy sensors | $1,157 | $2,000 |
$764
6,061
kWh
|
$393
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $469,956 | $1,710,637 |
$90,984
722,084
kWh
|
$29,022
-
kW-mo/yr
|
$349,950
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Energy Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs