ITAC Assessment: CI0041
ITAC logo
ITAC Assessment: CI0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Powder Metallurgy
NAICS 332117: Powder Metallurgy Part Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 23
Plant Area 70,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 4,420
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,108 556,274
kWh
Electricity Demand $47,116 3,359
kW-mo/yr
Electricity Fees $2,464 -
Natural Gas $30,524 2,779
MMBtu
Other Gas $4,334 1
MMBtu
Other Energy $349,950 1
MMBtu
Waste Disposal Costs
Water Usage $2,969 436
Tgal
TOTAL YEARLY COSTS $507,465
RECOMMENDED SAVINGS* $469,956 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings
01 4.212: Adopt in-house material generation $349,950 $1,386,072 - - $349,950
-
MMBtu
02 2.9114: Use solar heat to make electricty $35,660 $280,607 $26,936
213,774
kWh
$8,724
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $24,870 $5,200 $21,604
171,460
kWh
$3,266
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $19,096 $20,568 $14,648
116,250
kWh
$4,448
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $17,211 $5,150 $17,211
136,600
kWh
- -
06 2.2442: Preheat combustion air with waste heat $16,338 $9,000 $7,718
61,251
kWh
$8,620
-
kW-mo/yr
-
07 2.3132: Recharge batteries on during off-peak demand periods $3,571 $40 - $3,571
-
kW-mo/yr
-
08 2.7232: Replace existing hvac unit with high efficiency model $2,103 $2,000 $2,103
16,688
kWh
- -
09 2.7135: Install occupancy sensors $1,157 $2,000 $764
6,061
kWh
$393
-
kW-mo/yr
-
TOTAL RECOMMENDED $469,956 $1,710,637 $90,984
722,084
kWh
$29,022
-
kW-mo/yr
$349,950
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs