Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonferrous forging
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CI0077 #10 Y:2026 Install occupancy sensors $1,103 $3,000
CI0077 #09 Y:2026 Reduce the pressure of compressed air to the minimum required $1,296 -
CI0077 #08 Y:2026 Preheat combustion air with waste heat $1,996 $3,250
CI0077 #07 Y:2026 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $5,776 $3,150
CI0077 #06 Y:2026 Adjust burners for efficient operation $13,491 $100,000
CI0077 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $14,547 $3,000
CI0077 #04 Y:2026 Adjust / maintain fork lift trucks for most efficient operation $46,486 $120,000
CI0077 #03 Y:2026 Use solar heat to make electricty $94,979 $712,390
CI0077 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $104,866 $2,900
CI0077 #01 Y:2026 Replace heat treating oven with more efficient unit $881,685 $6,000,000
SD0538 #09 Y:2016 Eliminate or reduce compressed air usage $577 $1,000
SD0538 #08 Y:2016 Use most efficient type of electric motors $877 $1,988
SD0538 #07 Y:2016 Turn off equipment during breaks, reduce operating time $952 $750
SD0538 #06 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $5,200 $13,950
SD0538 #05 Y:2016 Insulate bare equipment $5,664 $2,520
SD0538 #04 Y:2016 Utilize daylight whenever possible in lieu of artificial light $12,722 $54,880
SD0538 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $17,549 $26,272
SD0538 #02 Y:2016 Improve combustion control capability $17,613 $46,250
SD0538 #01 Y:2016 Optimize plant power factor $29,703 $94,750
SD0511 #06 Y:2015 Insulate bare equipment $812 $2,323