66
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Nonferrous forging | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| CI0077 #10 Y:2026 | 10 | 2026 | Install occupancy sensors | $1,103 | $3,000 |
n/a
|
| CI0077 #09 Y:2026 | 09 | 2026 | Reduce the pressure of compressed air to the minimum required | $1,296 | - |
n/a
|
| CI0077 #08 Y:2026 | 08 | 2026 | Preheat combustion air with waste heat | $1,996 | $3,250 |
n/a
|
| CI0077 #07 Y:2026 | 07 | 2026 | Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $5,776 | $3,150 |
n/a
|
| CI0077 #06 Y:2026 | 06 | 2026 | Adjust burners for efficient operation | $13,491 | $100,000 |
n/a
|
| CI0077 #05 Y:2026 | 05 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $14,547 | $3,000 |
n/a
|
| CI0077 #04 Y:2026 | 04 | 2026 | Adjust / maintain fork lift trucks for most efficient operation | $46,486 | $120,000 |
n/a
|
| CI0077 #03 Y:2026 | 03 | 2026 | Use solar heat to make electricty | $94,979 | $712,390 |
n/a
|
| CI0077 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $104,866 | $2,900 |
n/a
|
| CI0077 #01 Y:2026 | 01 | 2026 | Replace heat treating oven with more efficient unit | $881,685 | $6,000,000 |
n/a
|
| SD0538 #09 Y:2016 | 09 | 2016 | Eliminate or reduce compressed air usage | $577 | $1,000 | |
| SD0538 #08 Y:2016 | 08 | 2016 | Use most efficient type of electric motors | $877 | $1,988 | |
| SD0538 #07 Y:2016 | 07 | 2016 | Turn off equipment during breaks, reduce operating time | $952 | $750 | |
| SD0538 #06 Y:2016 | 06 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $5,200 | $13,950 | |
| SD0538 #05 Y:2016 | 05 | 2016 | Insulate bare equipment | $5,664 | $2,520 | |
| SD0538 #04 Y:2016 | 04 | 2016 | Utilize daylight whenever possible in lieu of artificial light | $12,722 | $54,880 | |
| SD0538 #03 Y:2016 | 03 | 2016 | Utilize higher efficiency lamps and/or ballasts | $17,549 | $26,272 | |
| SD0538 #02 Y:2016 | 02 | 2016 | Improve combustion control capability | $17,613 | $46,250 | |
| SD0538 #01 Y:2016 | 01 | 2016 | Optimize plant power factor | $29,703 | $94,750 | |
| SD0511 #06 Y:2015 | 06 | 2015 | Insulate bare equipment | $812 | $2,323 |