420
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Iron and steel forging | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TR0020 #03 Y:2019 | 03 | 2019 | Utilize higher efficiency lamps and/or ballasts | $558 | $150 | |
| TR0020 #02 Y:2019 | 02 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $1,748 | - | |
| TR0020 #01 Y:2019 | 01 | 2019 | Reduce illumination to minimum necessary levels | $1,021 | - | |
| IC0225 #07 Y:2019 | 07 | 2019 | Use radiant heater for spot heating | $10,365 | $18,280 | |
| IC0225 #06 Y:2019 | 06 | 2019 | Repair or replace steam traps | $2,596 | $652 | |
| IC0225 #05 Y:2019 | 05 | 2019 | Use adjustable frequency drive or multiple speed motors on existing system | $13,711 | $3,850 | |
| IC0225 #04 Y:2019 | 04 | 2019 | Utilize higher efficiency lamps and/or ballasts | $7,947 | $3,110 | |
| IC0225 #03 Y:2019 | 03 | 2019 | Install compressor air intakes in coolest locations | $3,600 | $105 | |
| IC0225 #02 Y:2019 | 02 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $13,274 | $4,150 | |
| IC0225 #01 Y:2019 | 01 | 2019 | Install adequate dryers on air lines to eliminate blowdown | $44,444 | $23,100 | |
| WV0584 #11 Y:2019 | 11 | 2019 | Reduce the pressure of compressed air to the minimum required | $876 | $358 | |
| WV0584 #10 Y:2019 | 10 | 2019 | Utilize higher efficiency lamps and/or ballasts | $3,028 | $5,443 | |
| WV0584 #09 Y:2019 | 09 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,899 | $510 | |
| WV0584 #08 Y:2019 | 08 | 2019 | Upgrade controls on compressors | $5,427 | $8,500 | |
| WV0584 #07 Y:2019 | 07 | 2019 | Establish a predictive maintenance program | $5,503 | $1,000 | |
| WV0584 #06 Y:2019 | 06 | 2019 | Develop a repair/replace policy | $7,129 | $675 | |
| WV0584 #05 Y:2019 | 05 | 2019 | Insulate bare equipment | $18,530 | $6,283 | |
| WV0584 #04 Y:2019 | 04 | 2019 | Recycle white water | $26,110 | $17,500 | |
| WV0584 #03 Y:2019 | 03 | 2019 | Analyze flue gas for proper air/fuel ratio | $44,593 | $129,500 | |
| WV0584 #02 Y:2019 | 02 | 2019 | Use adjustable frequency drive or multiple speed motors on existing system | $72,031 | $169,200 |