Assessment Year | 2019 |
---|---|
Principal Product | stamped metal parts |
NAICS | 332111: Iron and Steel Forging |
SIC | 3462: Iron and Steel Forgings |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
344,124
ft2
|
Annual Production | 693,500
pieces
|
Production Hrs. Annual | 4,200
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $55,133 | 1,206,258 |
kWh
|
$0.046 |
Electricity Demand | $47,084 | 4,605 |
kW-mo/yr
|
$10.22 |
Electricity Fees | $3,364 | - |
|
- |
TOTAL YEARLY COSTS | $105,581 | |||
RECOMMENDED SAVINGS* | $53,968 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,688 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $1,021 | - |
$1,002
8,808
kWh
|
- | $19 | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,748 | - |
$616
13,480
kWh
|
$1,132
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $558 | $150 |
$154
3,364
kWh
|
$47
-
kW-mo/yr
|
- | $357 | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,914 | $3,155 |
$7,880
172,421
kWh
|
$5,035
-
kW-mo/yr
|
- | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $12,445 | $810 |
$7,537
164,913
kWh
|
$4,909
-
kW-mo/yr
|
- | - | |
06 | 2.9114: Use solar heat to make electricty | $25,280 | $40,101 |
$25,280
553,173
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $53,968 | $44,216 |
$42,468
916,159
kWh
|
$11,123
-
kW-mo/yr
|
$19 | $357 | ||
TOTAL IMPLEMENTED | $28,688 | $4,115 |
$17,188
362,986
kWh
|
$11,123
-
kW-mo/yr
|
$19 | $357 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs