418
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Iron and steel forging | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
IC0336 #12 Y:2025 | 12 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $20,648 | $93,094 |
n/a
|
IC0336 #11 Y:2025 | 11 | 2025 | Use waste heat from hot flue gases to preheat | $114,765 | $180,000 |
n/a
|
IC0336 #10 Y:2025 | 10 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $336 | $1,138 |
n/a
|
IC0336 #09 Y:2025 | 09 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $321 | $244 |
n/a
|
IC0336 #08 Y:2025 | 08 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $8,096 | $14,284 |
n/a
|
IC0336 #07 Y:2025 | 07 | 2025 | Lower temperature during the winter season and vice-versa | $56 | - |
n/a
|
IC0336 #06 Y:2025 | 06 | 2025 | Install compressor air intakes in coolest locations | $2,910 | $760 |
n/a
|
IC0336 #05 Y:2025 | 05 | 2025 | Utilize higher efficiency lamps and/or ballasts | $81 | $130 |
n/a
|
IC0336 #04 Y:2025 | 04 | 2025 | Use or replace with energy efficient substitutes | $5,080 | $2,052 |
n/a
|
IC0336 #03 Y:2025 | 03 | 2025 | Recharge batteries on during off-peak demand periods | $397 | - |
n/a
|
IC0336 #02 Y:2025 | 02 | 2025 | Use insulation in furnaces to facilitate heating / cooling | $4,518 | $3,700 |
n/a
|
IC0336 #01 Y:2025 | 01 | 2025 | Use insulation in furnaces to facilitate heating / cooling | $4,706 | $1,100 |
n/a
|
AM0959 #06 Y:2025 | 06 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $83,930 | $15,300 |
n/a
|
AM0959 #05 Y:2025 | 05 | 2025 | Install skylights | $3,050 | $7,200 |
n/a
|
AM0959 #04 Y:2025 | 04 | 2025 | Eliminate or reduce compressed air usage | $98,900 | $5,262 |
n/a
|
AM0959 #03 Y:2025 | 03 | 2025 | Optimize plant power factor | $48,315 | $58,703 |
n/a
|
AM0959 #02 Y:2025 | 02 | 2025 | Use synthetic lubricant | $4,748 | $60 |
n/a
|
AM0959 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $59,878 | $637,500 |
n/a
|
TT0335 #08 Y:2025 | 08 | 2025 | Use solar heat to make electricty | $36,172 | $520,500 |
n/a
|
TT0335 #07 Y:2025 | 07 | 2025 | Meter recycled water (to reduce sewer charges) | $4,933 | $9,000 |
n/a
|