Assessment Year | 2025 |
---|---|
Principal Product | Iron and Steel Forgings |
NAICS | 332111: Iron and Steel Forging |
SIC | 3462: Iron and Steel Forgings |
Sales Range | $100 M to 500M |
# of Employees | 175 |
Plant Area |
280,000
ft2
|
Annual Production | 100,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,609,008 | 27,336,950 |
kWh
|
$0.059 |
Natural Gas | $224,140 | 385,799 |
MMBtu
|
$0.58 |
TOTAL YEARLY COSTS | $1,833,148 | |||
RECOMMENDED SAVINGS* | $59,002 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $27,629 | $34,630 |
$27,629
469,078
kWh
|
- | - | - | |
02 | 2.4151: Develop a repair/replace policy | $9,972 | $8,140 |
$10,332
175,423
kWh
|
- | - | $(-360.0) | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,352 | $3,890 | - |
$9,352
-
MMBtu
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,385 | $5,940 |
$5,385
91,417
kWh
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,725 | $848 |
$2,725
46,271
kWh
|
- | - | - | |
06 | 2.2511: Insulate bare equipment | $1,989 | $4,797 | - |
$1,989
-
MMBtu
|
- | - | |
07 | 2.4157: Establish a predictive maintenance program | $1,642 | $5,200 |
$4,898
83,164
kWh
|
- | $(-3,256.0) | - | |
08 | 2.4239: Eliminate or reduce compressed air usage | $308 | $675 |
$308
5,223
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $59,002 | $64,120 |
$51,277
870,576
kWh
|
$11,341
-
MMBtu
|
$(-3,256.0) | $(-360.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs