Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Forging and stamping
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0769 #05 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $3,874 $7,200
MA0769 #04 Y:2016 Replace dc equipment with ac equipment $8,620 $57,572
MA0769 #03 Y:2016 Insulate bare equipment $12,391 $11,273
MA0769 #02 Y:2016 Replace electrically-operated equipment with fossil fuel equipment $30,931 $24,720
MA0769 #01 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $90,487 $39,330
MA0606 #12 Y:2006 Optimize plant power factor $14,940 $11,400
MA0606 #11 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $47,776 $27,573
MA0606 #10 Y:2006 Use optimum temperature $79,097 $21,125
MA0606 #09 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $95,360 $195,000
MA0606 #08 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $130,688 $6,000
MA0606 #07 Y:2006 Utilize controls to operate equipment only when needed $132,608 $196,800
MA0606 #06 Y:2006 Use waste heat from hot flue gases to preheat $89,232 $165,000
MA0606 #05 Y:2006 Use waste heat from hot flue gases to preheat $169,598 $120,520
MA0606 #04 Y:2006 Use waste heat from hot flue gases to preheat $285,051 $60,000
MA0606 #03 Y:2006 Reduce combustion air flow to optimum $55,708 $2,000
MA0606 #02 Y:2006 Reduce combustion air flow to optimum $298,083 $2,000
MA0606 #01 Y:2006 Reduce combustion air flow to optimum $617,366 $36,000
MA0568 #06 Y:2004 Recover waste heat from equipment $3,459 $2,888
MA0568 #05 Y:2004 Limit and control secondary combustion air in furnace $4,092 $6,000
MA0568 #04 Y:2004 Optimize plant power factor $5,122 $6,750