23
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0769 #05 Y:2016 | 05 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $3,874 | $7,200 | |
| MA0769 #04 Y:2016 | 04 | 2016 | Replace dc equipment with ac equipment | $8,620 | $57,572 | |
| MA0769 #03 Y:2016 | 03 | 2016 | Insulate bare equipment | $12,391 | $11,273 | |
| MA0769 #02 Y:2016 | 02 | 2016 | Replace electrically-operated equipment with fossil fuel equipment | $30,931 | $24,720 | |
| MA0769 #01 Y:2016 | 01 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $90,487 | $39,330 | |
| MA0606 #12 Y:2006 | 12 | 2006 | Optimize plant power factor | $14,940 | $11,400 | |
| MA0606 #11 Y:2006 | 11 | 2006 | Use adjustable frequency drive or multiple speed motors on existing system | $47,776 | $27,573 | |
| MA0606 #10 Y:2006 | 10 | 2006 | Use optimum temperature | $79,097 | $21,125 | |
| MA0606 #09 Y:2006 | 09 | 2006 | Use adjustable frequency drive or multiple speed motors on existing system | $95,360 | $195,000 | |
| MA0606 #08 Y:2006 | 08 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $130,688 | $6,000 | |
| MA0606 #07 Y:2006 | 07 | 2006 | Utilize controls to operate equipment only when needed | $132,608 | $196,800 | |
| MA0606 #06 Y:2006 | 06 | 2006 | Use waste heat from hot flue gases to preheat | $89,232 | $165,000 | |
| MA0606 #05 Y:2006 | 05 | 2006 | Use waste heat from hot flue gases to preheat | $169,598 | $120,520 | |
| MA0606 #04 Y:2006 | 04 | 2006 | Use waste heat from hot flue gases to preheat | $285,051 | $60,000 | |
| MA0606 #03 Y:2006 | 03 | 2006 | Reduce combustion air flow to optimum | $55,708 | $2,000 | |
| MA0606 #02 Y:2006 | 02 | 2006 | Reduce combustion air flow to optimum | $298,083 | $2,000 | |
| MA0606 #01 Y:2006 | 01 | 2006 | Reduce combustion air flow to optimum | $617,366 | $36,000 | |
| MA0568 #06 Y:2004 | 06 | 2004 | Recover waste heat from equipment | $3,459 | $2,888 | |
| MA0568 #05 Y:2004 | 05 | 2004 | Limit and control secondary combustion air in furnace | $4,092 | $6,000 | |
| MA0568 #04 Y:2004 | 04 | 2004 | Optimize plant power factor | $5,122 | $6,750 |