ITAC Assessment: MA0606
ITAC logo
ITAC Assessment: MA0606
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Steel, Inconel, and Titanium Forgings
NAICS 332111: Iron and Steel Forging
SIC 3462: Iron and Steel Forgings
Sales Range $100
M
to 500
M
# of Employees 550
Plant Area 1,000,000
ft2
Annual Production 11,500,000
lb
Production Hrs. Annual 6,994
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,994,695 40,305,600
kWh
Electricity Demand $201,250 85,848
kW-mo/yr
Electricity Fees $807 -
Natural Gas $7,484,764 854,830
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,015,507 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $130,688

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1113: Reduce combustion air flow to optimum $617,366 $36,000 - - $617,366
-
MMBtu
02 2.1113: Reduce combustion air flow to optimum $298,083 $2,000 - - $298,083
-
MMBtu
03 2.1113: Reduce combustion air flow to optimum $55,708 $2,000 - - $55,708
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $285,051 $60,000 $(-28,400.0)
(-177,500)
kWh
$(-859.0)
-
kW-mo/yr
$314,310
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $169,598 $120,520 $(-52,240.0)
(-326,500)
kWh
$(-1,068.0)
-
kW-mo/yr
$222,906
-
MMBtu
06 2.2414: Use waste heat from hot flue gases to preheat $89,232 $165,000 $(-20,896.0)
(-130,600)
kWh
$(-429.0)
-
kW-mo/yr
$110,557
-
MMBtu
07 2.6231: Utilize controls to operate equipment only when needed $132,608 $196,800 $132,608
828,800
kWh
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $130,688 $6,000 $130,688
816,800
kWh
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $95,360 $195,000 $95,360
596,000
kWh
- -
10 2.2211: Use optimum temperature $79,097 $21,125 - - $79,097
-
MMBtu
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $47,776 $27,573 $47,776
298,600
kWh
- -
12 2.3212: Optimize plant power factor $14,940 $11,400 - $14,940
-
kW-mo/yr
-
TOTAL RECOMMENDED $2,015,507 $843,418 $304,896
1,905,600
kWh
$12,584
-
kW-mo/yr
$1,698,027
-
MMBtu
TOTAL IMPLEMENTED $130,688 $6,000 $130,688
816,800
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs