1,184
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TT0335 #07 Y:2025 | 07 | 2025 | Meter recycled water (to reduce sewer charges) | $4,933 | $9,000 | |
| TT0335 #06 Y:2025 | 06 | 2025 | Use or replace with energy efficient substitutes | $11,177 | $11,250 | |
| TT0335 #05 Y:2025 | 05 | 2025 | Install vinyl strip / high speed / air curtain doors | $12,543 | $4,000 | |
| TT0335 #04 Y:2025 | 04 | 2025 | Use a less expensive method of waste removal | $263,515 | $80,000 | |
| TT0335 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,409 | $1,885 | |
| TT0335 #02 Y:2025 | 02 | 2025 | Initiate a program to acquire iso certification | $78,715 | $15,000 | |
| TT0335 #01 Y:2025 | 01 | 2025 | Use power during off-peak periods | $1,852 | $60 | |
| WV0681 #08 Y:2025 | 08 | 2025 | Eliminate or reduce compressed air usage | $308 | $675 | |
| WV0681 #07 Y:2025 | 07 | 2025 | Establish a predictive maintenance program | $1,642 | $5,200 | |
| WV0681 #06 Y:2025 | 06 | 2025 | Insulate bare equipment | $1,989 | $4,797 | |
| WV0681 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,725 | $848 | |
| WV0681 #04 Y:2025 | 04 | 2025 | Utilize higher efficiency lamps and/or ballasts | $5,385 | $5,940 | |
| WV0681 #03 Y:2025 | 03 | 2025 | Analyze flue gas for proper air/fuel ratio | $9,352 | $3,890 | |
| WV0681 #02 Y:2025 | 02 | 2025 | Develop a repair/replace policy | $9,972 | $8,140 | |
| WV0681 #01 Y:2025 | 01 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $27,629 | $34,630 | |
| TT0333 #08 Y:2025 | 08 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $596 | $1,186 | |
| TT0333 #07 Y:2025 | 07 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $1,569 | $3,000 | |
| TT0333 #06 Y:2025 | 06 | 2025 | Replace high resistance ducts, pipes, and fittings | $3,915 | $1,640 | |
| TT0333 #05 Y:2025 | 05 | 2025 | Recover waste heat from equipment | $3,400 | $21,000 | |
| TT0333 #04 Y:2025 | 04 | 2025 | Turn off equipment when not in use | $3,979 | $900 |