ITAC Assessment: TT0333
ITAC logo
ITAC Assessment: TT0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Railway Fasteners
NAICS 332111: Iron and Steel Forging
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 250,000
ft2
Annual Production 18,000,000
units
Production Hrs. Annual 5,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $524,757 7,875,600
kWh
Electricity Demand $364,795 24,358
kW-mo/yr
Natural Gas $85,065 19,592
MMBtu
Waste Disposal Costs
Water Usage $20,103 6,994
Tgal
Water Disposal $23,090 6,493
Tgal
TOTAL YEARLY COSTS $1,017,810
RECOMMENDED SAVINGS* $149,625 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $88,627 $794,938 $88,627
1,328,747
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $39,658 $1,500 $27,976
420,066
kWh
$11,682
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $7,881 $94 $5,560
83,485
kWh
$2,321
-
kW-mo/yr
-
04 2.6218: Turn off equipment when not in use $3,979 $900 $3,979
59,738
kWh
- -
05 2.2437: Recover waste heat from equipment $3,400 $21,000 $(-564.0)
(-8,467)
kWh
- $3,964
-
MMBtu
06 2.5122: Replace high resistance ducts, pipes, and fittings $3,915 $1,640 $3,915
58,777
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,569 $3,000 $1,569
23,558
kWh
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $596 $1,186 $406
6,096
kWh
$190
-
kW-mo/yr
-
TOTAL RECOMMENDED $149,625 $824,258 $131,468
1,972,000
kWh
$14,193
-
kW-mo/yr
$3,964
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs