ITAC Assessment: UK1409
ITAC logo
ITAC Assessment: UK1409
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Metal Stampings
NAICS 334220: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 233,000
ft2
Annual Production 13,609,047
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,750 4,342,848
kWh
Electricity Demand $115,612 8,575
kW-mo/yr
Electricity Fees $62,368 -
Natural Gas $279,434 31,540
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $152,614 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.2442: Preheat combustion air with waste heat $27,758 $15,880 - - - $27,758
-
MMBtu
-
02 2.3212: Optimize plant power factor $13,858 $7,731 - - $13,858 - -
03 2.4221: Install compressor air intakes in coolest locations $3,135 $456 $3,135
89,560
kWh
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,815 $2,358 $11,815
337,584
kWh
- - - -
05 2.8112: Combine utility meters $2,250 $831 - - - - $2,250
06 2.8114: Change rate schedules or other changes in utility service $9,197 - - - - - $9,197
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,648 $16,700 $2,356
67,300
kWh
$2,292
-
kW-mo/yr
- - -
08 2.4322: Use or replace with energy efficient substitutes $33,225 $3,000 - - - $33,225
-
MMBtu
-
09 2.2511: Insulate bare equipment $10,898 $18,400 - - - $10,898
-
MMBtu
-
10 2.1233: Analyze flue gas for proper air/fuel ratio $8,187 $2,400 - - - $8,187
-
MMBtu
-
11 3.1161: Eliminate/reduce an operation $27,643 $9,000 - - - $27,643
-
MMBtu
-
TOTAL RECOMMENDED $152,614 $76,756 $17,306
494,444
kWh
$2,292
-
kW-mo/yr
$13,858 $107,711
-
MMBtu
$11,447
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs