Assessment Year | 2014 |
---|---|
Principal Product | Metal Stampings |
NAICS | 334220: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing |
SIC | 3663: Radio and Television Broadcasting and Communications Equipment |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
233,000
ft2
|
Annual Production | 13,609,047
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $152,750 | 4,342,848 |
kWh
|
$0.035 |
Electricity Demand | $115,612 | 8,575 |
kW-mo/yr
|
$13.48 |
Electricity Fees | $62,368 | - |
|
- |
Natural Gas | $279,434 | 31,540 |
MMBtu
|
$8.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $152,614 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2442: Preheat combustion air with waste heat | $27,758 | $15,880 | - | - | - |
$27,758
-
MMBtu
|
- | |
02 | 2.3212: Optimize plant power factor | $13,858 | $7,731 | - | - | $13,858 | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $3,135 | $456 |
$3,135
89,560
kWh
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,815 | $2,358 |
$11,815
337,584
kWh
|
- | - | - | - | |
05 | 2.8112: Combine utility meters | $2,250 | $831 | - | - | - | - | $2,250 | |
06 | 2.8114: Change rate schedules or other changes in utility service | $9,197 | - | - | - | - | - | $9,197 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,648 | $16,700 |
$2,356
67,300
kWh
|
$2,292
-
kW-mo/yr
|
- | - | - | |
08 | 2.4322: Use or replace with energy efficient substitutes | $33,225 | $3,000 | - | - | - |
$33,225
-
MMBtu
|
- | |
09 | 2.2511: Insulate bare equipment | $10,898 | $18,400 | - | - | - |
$10,898
-
MMBtu
|
- | |
10 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,187 | $2,400 | - | - | - |
$8,187
-
MMBtu
|
- | |
11 | 3.1161: Eliminate/reduce an operation | $27,643 | $9,000 | - | - | - |
$27,643
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $152,614 | $76,756 |
$17,306
494,444
kWh
|
$2,292
-
kW-mo/yr
|
$13,858 |
$107,711
-
MMBtu
|
$11,447 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs