ITAC Assessment: ME0179
ITAC logo
ITAC Assessment: ME0179
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Shoes
NAICS
n/a
SIC 3143: Men's Footwear, Except Athletic
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 69,321
ft2
Annual Production 650,000
pieces
Production Hrs. Annual 2,440
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,348 734,760
kWh
Electricity Demand $33,431 4,047
kW-mo/yr
Electricity Fees $1,834 -
Natural Gas $4,452 1,002
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,505 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,876

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $25,031 $47,372 $14,889
133,353
kWh
$10,142
-
kW-mo/yr
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,629 $2,864 $6,273
63,892
kWh
$1,162
-
kW-mo/yr
$(-2,806.0)
-
MMBtu
03 2.2511: Insulate bare equipment $941 $2,145 $941
13,482
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $579 $350 $579
8,206
kWh
- -
05 2.6218: Turn off equipment when not in use $325 - $324
2,638
kWh
$1
-
kW-mo/yr
-
TOTAL RECOMMENDED $31,505 $52,731 $23,006
221,571
kWh
$11,305
-
kW-mo/yr
$(-2,806.0)
-
MMBtu
TOTAL IMPLEMENTED $26,876 $49,867 $16,733
157,679
kWh
$10,143
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs