Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other nonferrous metal foundries (except die-casting)
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0200 #02 Y:2004 Air condition only space necessary $9,386 $360
LE0200 #01 Y:2004 Reschedule plant operations or reduce load to avoid peaks $18,210 $3,000
LM0080 #07 Y:2004 Utilize daylight whenever possible in lieu of artificial light $869 -
LM0080 #06 Y:2004 Reschedule plant operations or reduce load to avoid peaks $23,164 $300
LM0080 #05 Y:2004 Replace existing equipment with more suitable substitutes $3,467 $6,000
LM0080 #04 Y:2004 Re-arrange equipment layout to reduce labor costs $28,600 $20,592
LM0080 #03 Y:2004 Adjust burners for efficient operation $537 -
LM0080 #02 Y:2004 Remove or close off unneeded compressed air lines $266 $165
LM0080 #01 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $621 $475
BD0232 #11 Y:2003 Pay bills on time to avoid late fees $214 -
BD0232 #10 Y:2003 Minimize water usage $592 $1,265
BD0232 #09 Y:2003 Contract a wood pallet recycling company $1,450 $1,000
BD0232 #08 Y:2003 Lease / purchase baler; sell cardboard to recycler $9,224 $5,500
BD0232 #07 Y:2003 Utilize energy-efficient belts and other improved mechanisms $527 $140
BD0232 #06 Y:2003 Utilize higher efficiency lamps and/or ballasts $513 $195
BD0232 #05 Y:2003 Install occupancy sensors $574 $1,050
BD0232 #04 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $794 $700
BD0232 #03 Y:2003 Use most efficient type of electric motors $1,485 $3,400
BD0232 #02 Y:2003 Utilize higher efficiency lamps and/or ballasts $1,559 $2,240
BD0232 #01 Y:2003 Reduce the pressure of compressed air to the minimum required $1,953 -