Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other nonferrous metal foundries (except die-casting)
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0428 #06 Y:2016 Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,118 $10,500
LE0428 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $769 $3,192
LE0428 #04 Y:2016 Utilize higher efficiency lamps and/or ballasts $2,863 $10,608
LE0428 #03 Y:2016 Use / purchase optimum sized compressor $3,953 $9,500
LE0428 #02 Y:2016 Install compressor air intakes in coolest locations $340 $800
LE0428 #01 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $1,923 $1,000
MZ0194 #03 Y:2015 Use or replace with energy efficient substitutes $1,332 $4,400
MZ0194 #02 Y:2015 Install occupancy sensors $1,023 $610
MZ0194 #01 Y:2015 Utilize higher efficiency lamps and/or ballasts $1,734 $6,785
UD0916 #12 Y:2014 Contract a wood pallet recycling company $12,800 -
UD0916 #11 Y:2014 Enhance sensitivity of temperature control and cutoff $9,661 $40,000
UD0916 #10 Y:2014 Upgrade controls on compressors $10,562 $110,000
UD0916 #09 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $6,978 $1,000
UD0916 #08 Y:2014 Reduce the pressure of compressed air to the minimum required $896 -
UD0916 #07 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $1,426 $4,150
UD0916 #06 Y:2014 Install occupancy sensors $503 $500
UD0916 #05 Y:2014 Utilize higher efficiency lamps and/or ballasts $14,413 $26,040
UD0916 #04 Y:2014 Recover heat from exhausted steam, hot air or hot water $25,351 $43,280
UD0916 #03 Y:2014 Install motor voltage controller on lightly loaded motors $6,076 $11,700
UD0916 #02 Y:2014 Utilize energy-efficient belts and other improved mechanisms $2,027 -