| Assessment Year | 2017 |
|---|---|
| Principal Product | Bronze Casting |
| NAICS | 331529: Other Nonferrous Metal Foundries (except Die-Casting) |
| SIC | 3369: Nonferrous Foundries, Except Aluminum and Copper |
| Sales Range | $10 M to 50M |
| # of Employees | 49 |
| Plant Area |
44,000
ft2
|
| Annual Production | 2,000
units
|
| Production Hrs. Annual | 2,450
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $200,814 | 2,533,108 |
kWh
|
$0.079 |
| Electricity Demand | $116,286 | 20,322 |
kW-mo/yr
|
$5.72 |
| Electricity Fees | $41,650 | - |
|
- |
| Natural Gas | $26,480 | 2,672 |
MMBtu
|
$9.91 |
| TOTAL YEARLY COSTS | $385,230 | |||
| RECOMMENDED SAVINGS* | $11,966 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,673 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,923 | $1,000 |
$1,208
15,296
kWh
|
$715
-
kW-mo/yr
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $340 | $800 |
$214
2,713
kWh
|
$126
-
kW-mo/yr
|
- | |
| 03 | 2.4226: Use / purchase optimum sized compressor | $3,953 | $9,500 |
$2,797
35,409
kWh
|
$1,155
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,863 | $10,608 |
$2,114
26,754
kWh
|
$749
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $769 | $3,192 |
$569
7,203
kWh
|
$200
-
kW-mo/yr
|
- | |
| 06 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $2,118 | $10,500 |
$(-338.9)
(-4,290)
kWh
|
$(-228.8)
-
kW-mo/yr
|
$2,686
-
MMBtu
|
|
| TOTAL RECOMMENDED | $11,966 | $35,600 |
$6,563
83,085
kWh
|
$2,717
-
kW-mo/yr
|
$2,686
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,673 | $25,300 |
$3,552
44,963
kWh
|
$1,436
-
kW-mo/yr
|
$2,686
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs