ITAC Assessment: SJ0034
ITAC logo
ITAC Assessment: SJ0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Treated water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $1
M
to 5
M
# of Employees 3
Plant Area 4,000
ft2
Annual Production 106,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,887 307,668
kWh
Electricity Demand $19,617 984
kW-mo/yr
Electricity Fees $3,945 -
TOTAL YEARLY COSTS $105,449
RECOMMENDED SAVINGS* $48,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.9114: Use solar heat to make electricty $31,541 $106,228 $26,266
98,689
kWh
$5,275
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,631 $10,962 $12,631
47,486
kWh
- -
03 2.2211: Use optimum temperature $3,458 - $3,458
13,000
kWh
- -
04 2.3137: Use power during off-peak periods $1,270 - - - $1,270
TOTAL RECOMMENDED $48,900 $117,190 $42,355
159,175
kWh
$5,275
-
kW-mo/yr
$1,270
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs