| Assessment Year | 2025 |
|---|---|
| Principal Product | Treated water |
| NAICS | 221310: Water Supply and Irrigation Systems |
| SIC | 4941: Water Supply |
| Sales Range | $1 M to 5M |
| # of Employees | 3 |
| Plant Area |
4,000
ft2
|
| Annual Production | 106,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $81,887 | 307,668 |
kWh
|
$0.27 |
| Electricity Demand | $19,617 | 984 |
kW-mo/yr
|
$19.94 |
| Electricity Fees | $3,945 | - |
|
- |
| TOTAL YEARLY COSTS | $105,449 | |||
| RECOMMENDED SAVINGS* | $48,900 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $47,630 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $31,541 | $106,228 |
$26,266
98,689
kWh
|
$5,275
-
kW-mo/yr
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,631 | $10,962 |
$12,631
47,486
kWh
|
- | - | |
| 03 | 2.2211: Use optimum temperature | $3,458 | - |
$3,458
13,000
kWh
|
- | - | |
| 04 | 2.3137: Use power during off-peak periods | $1,270 | - | - | - | $1,270 | |
| TOTAL RECOMMENDED | $48,900 | $117,190 |
$42,355
159,175
kWh
|
$5,275
-
kW-mo/yr
|
$1,270 | ||
| TOTAL IMPLEMENTED | $47,630 | $117,190 |
$42,355
159,175
kWh
|
$5,275
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs