ITAC Assessment: MZ0194
ITAC logo
ITAC Assessment: MZ0194
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product aluminum castings
NAICS 331529: Other Nonferrous Metal Foundries (except Die-Casting)
SIC 3365: Aluminum Foundries
Sales Range $10
M
to 50
M
# of Employees 10
Plant Area 30,000
ft2
Annual Production 60,000
pieces
Production Hrs. Annual 2,730
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,511 852,000
kWh
Electricity Demand $37,380 6,660
kW-mo/yr
Natural Gas $25,304 2,550
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,089 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,734 $6,785 $1,522
19,490
kWh
$212
-
kW-mo/yr
02 2.7135: Install occupancy sensors $1,023 $610 $750
9,607
kWh
$273
-
kW-mo/yr
03 2.4322: Use or replace with energy efficient substitutes $1,332 $4,400 $1,055
13,520
kWh
$278
-
kW-mo/yr
TOTAL RECOMMENDED $4,089 $11,795 $3,327
42,617
kWh
$762
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs