403
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Aluminum foundries (except die-casting) | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SJ0054 #07 Y:2026 | 07 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $2,446 | $13,610 |
n/a
|
| SJ0054 #06 Y:2026 | 06 | 2026 | Insulate bare equipment | $109 | $183 |
n/a
|
| SJ0054 #05 Y:2026 | 05 | 2026 | Turn off equipment during breaks, reduce operating time | $1,244 | - |
n/a
|
| SJ0054 #04 Y:2026 | 04 | 2026 | Use battery storage for demand control | $8,817 | - |
n/a
|
| SJ0054 #03 Y:2026 | 03 | 2026 | Use optimum temperature | $1,605 | - |
n/a
|
| SJ0054 #02 Y:2026 | 02 | 2026 | Reduce the pressure of compressed air to the minimum required | $3,160 | - |
n/a
|
| SJ0054 #01 Y:2026 | 01 | 2026 | Use or replace with energy efficient substitutes | $14,993 | - |
n/a
|
| OR0810 #03 Y:2025 | 03 | 2025 | Use solar heat to make electricty | $82,382 | $1,300,527 | |
| OR0810 #02 Y:2025 | 02 | 2025 | Eliminate or reduce compressed air usage | $1,702 | $1,080 | |
| OR0810 #01 Y:2025 | 01 | 2025 | Reduce the pressure of compressed air to the minimum required | $1,031 | $626 | |
| WM0233 #06 Y:2024 | 06 | 2024 | Lower temperature during the winter season and vice-versa | $329 | $810 | |
| WM0233 #05 Y:2024 | 05 | 2024 | Utilize higher efficiency lamps and/or ballasts | $373 | $3,136 | |
| WM0233 #04 Y:2024 | 04 | 2024 | Reduce the pressure of compressed air to the minimum required | $1,278 | - | |
| WM0233 #03 Y:2024 | 03 | 2024 | Replace obsolete burners with more efficient ones | $2,094 | $18,160 | |
| WM0233 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,262 | $1,500 | |
| WM0233 #01 Y:2024 | 01 | 2024 | Replace existing equipment with more suitable substitutes | $97,017 | $800,000 | |
| IP0202 #12 Y:2024 | 12 | 2024 | Use or replace with energy efficient substitutes | $743 | $2,940 | |
| IP0202 #11 Y:2024 | 11 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,920 | $1,969 | |
| IP0202 #10 Y:2024 | 10 | 2024 | Relocate oven / furnace to more efficient location | $752 | $700 | |
| IP0202 #09 Y:2024 | 09 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $36,012 | $11,226 |