Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonferrous metal foundries
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1040 #10 Y:2022 Reduce space conditioning during non-working hours $5,313 -
UD1040 #09 Y:2022 Reduce ventilation air $201,271 $872,653
UD1040 #08 Y:2022 Utilize higher efficiency lamps and/or ballasts $37,768 $58,100
UD1040 #07 Y:2022 Install occupancy sensors $13,562 $11,900
UD1040 #06 Y:2022 Optimize plant power factor $45,386 $62,689
UD1040 #05 Y:2022 Meter recycled water (to reduce sewer charges) $146,536 $40,000
UD1040 #04 Y:2022 Meter recycled water (to reduce sewer charges) $78,304 $700
UD1040 #03 Y:2022 Reduce ventilation air $8,723 -
UD1040 #02 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $12,896 $453
UD1040 #01 Y:2022 Cover open tanks $3,104 -
UD0989 #05 Y:2018 Install occupancy sensors $1,362 $1,935
UD0989 #04 Y:2018 Use waste heat from hot flue gases to preheat $5,885 $6,000
UD0989 #03 Y:2018 Eliminate or reduce compressed air usage $1,012 -
UD0989 #02 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $3,291 $1,000
UD0989 #01 Y:2018 Turn off equipment during breaks, reduce operating time $1,033 -
UD0979 #12 Y:2017 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $180,631 $300,000
UD0979 #11 Y:2017 Add area lighting switches $1,666 $130
UD0979 #10 Y:2017 Utilize higher efficiency lamps and/or ballasts $49,834 $68,160
UD0979 #09 Y:2017 Use optimum thickness insulation $18,548 $984
UD0979 #08 Y:2017 Use waste heat from hot flue gases to preheat $15,917 $12,782