Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

196

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Steel investment foundries
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0086 #06 Y:2016 Install occupancy sensors $481 $320
WM0086 #05 Y:2016 Utilize energy-efficient belts and other improved mechanisms $258 $200
WM0086 #04 Y:2016 Install compressor air intakes in coolest locations $548 $318
WM0086 #03 Y:2016 Use insulation in furnaces to facilitate heating / cooling $533 $276
WM0086 #02 Y:2016 Preheat combustion air with waste heat $1,302 $4,004
WM0086 #01 Y:2016 Use batch firing with kiln "furniture" specifically designed $3,034 $400
AM0707 #07 Y:2016 Use synthetic lubricant $103 -
AM0707 #06 Y:2016 Use or replace with energy efficient substitutes $310 $540
AM0707 #05 Y:2016 Reduce the pressure of compressed air to the minimum required $468 $80
AM0707 #04 Y:2016 Reduce space conditioning during non-working hours $1,650 $80
AM0707 #03 Y:2016 Change rate schedules or other changes in utility service $3,110 -
AM0707 #02 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $4,170 $2,000
AM0707 #01 Y:2016 Apply for tax-free status for energy purchases $49,370 $11,000
MA0741 #06 Y:2014 Install / repair insulation on steam lines $1,308 $2,775
MA0741 #05 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $3,279 $7,050
MA0741 #04 Y:2014 Replace electrically-operated equipment with fossil fuel equipment $24,147 $29,732
MA0741 #03 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $35,787 $14,025
MA0741 #02 Y:2014 Reduce combustion air flow to optimum $91,436 $5,000
MA0741 #01 Y:2014 Recover waste heat from equipment $131,224 $279,750
UM0420 #09 Y:2013 Install / repair insulation on steam lines $1,821 $1,000