ITAC Assessment: MA0741
ITAC logo
ITAC Assessment: MA0741
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Invstment castting
NAICS 331512: Steel Investment Foundries
SIC 3324: Steel Investment Foundries
Sales Range $10
M
to 50
M
# of Employees 88
Plant Area 98,870
ft2
Annual Production 109,000,000
lb
Production Hrs. Annual 5,712
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $631,649 8,599,923
kWh
Electricity Demand $309,003 52,813
kW-mo/yr
Electricity Fees $12,159 -
Natural Gas $631,571 84,561
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $287,181 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $131,224 $279,750 - - $131,224
-
MMBtu
02 2.1113: Reduce combustion air flow to optimum $91,436 $5,000 - - $91,436
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $35,787 $14,025 $25,456
346,809
kWh
- $10,331
-
MMBtu
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $24,147 $29,732 $33,934
462,315
kWh
$3,931
-
kW-mo/yr
$(-13,718.0)
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,279 $7,050 $3,279
44,670
kWh
- -
06 2.2136: Install / repair insulation on steam lines $1,308 $2,775 - - $1,308
-
MMBtu
TOTAL RECOMMENDED $287,181 $338,332 $62,669
853,794
kWh
$3,931
-
kW-mo/yr
$220,581
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs