Assessment Year | 2015 |
---|---|
Principal Product | Invstment castting |
NAICS | 331512: Steel Investment Foundries |
SIC | 3324: Steel Investment Foundries |
Sales Range | $10 M to 50M |
# of Employees | 88 |
Plant Area |
98,870
ft2
|
Annual Production | 109,000,000
lb
|
Production Hrs. Annual | 5,712
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $631,649 | 8,599,923 |
kWh
|
$0.073 |
Electricity Demand | $309,003 | 52,813 |
kW-mo/yr
|
$5.85 |
Electricity Fees | $12,159 | - |
|
- |
Natural Gas | $631,571 | 84,561 |
MMBtu
|
$7.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $287,181 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $131,224 | $279,750 | - | - |
$131,224
-
MMBtu
|
|
02 | 2.1113: Reduce combustion air flow to optimum | $91,436 | $5,000 | - | - |
$91,436
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $35,787 | $14,025 |
$25,456
346,809
kWh
|
- |
$10,331
-
MMBtu
|
|
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $24,147 | $29,732 |
$33,934
462,315
kWh
|
$3,931
-
kW-mo/yr
|
$(-13,718.0)
-
MMBtu
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,279 | $7,050 |
$3,279
44,670
kWh
|
- | - | |
06 | 2.2136: Install / repair insulation on steam lines | $1,308 | $2,775 | - | - |
$1,308
-
MMBtu
|
|
TOTAL RECOMMENDED | $287,181 | $338,332 |
$62,669
853,794
kWh
|
$3,931
-
kW-mo/yr
|
$220,581
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs