Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Ferrous metal foundries
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0476 #07 Y:2015 Turn off equipment when not in use $1,324 $215
SF0476 #06 Y:2015 Utilize energy-efficient belts and other improved mechanisms $2,722 $386
SF0476 #05 Y:2015 Utilize controls to operate equipment only when needed $9,486 $722
SF0476 #04 Y:2015 Turn off equipment when not in use $8,163 $913
SF0476 #03 Y:2015 Reschedule plant operations or reduce load to avoid peaks $5,817 -
SF0476 #02 Y:2015 Reduce the pressure of compressed air to the minimum required $8,100 $280
SF0476 #01 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $8,871 -
LM0118 #04 Y:2006 Upgrade controls on compressors $5,931 -
LM0118 #03 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $4,104 $425
LM0118 #02 Y:2006 Utilize higher efficiency lamps and/or ballasts $969 $2,578
LM0118 #01 Y:2006 Train operators for maximum operating efficiency $8,571 $10,004
LM0091 #07 Y:2004 Move product using mechanical means $16,875 $1,600
LM0091 #06 Y:2004 Develop standard procedures to improve internal yields $16,875 $2,150
LM0091 #05 Y:2004 Replace existing equipment with more suitable substitutes $8,750 $200
LM0091 #04 Y:2004 Re-arrange equipment layout to reduce labor costs $28,000 $1,260
LM0091 #03 Y:2004 Repair and eliminate steam leaks $764 $240
LM0091 #02 Y:2004 Install / repair insulation on steam lines $1,029 $683
LM0091 #01 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $709 $300