38
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SF0476 #07 Y:2015 | 07 | 2015 | Turn off equipment when not in use | $1,324 | $215 | |
| SF0476 #06 Y:2015 | 06 | 2015 | Utilize energy-efficient belts and other improved mechanisms | $2,722 | $386 | |
| SF0476 #05 Y:2015 | 05 | 2015 | Utilize controls to operate equipment only when needed | $9,486 | $722 | |
| SF0476 #04 Y:2015 | 04 | 2015 | Turn off equipment when not in use | $8,163 | $913 | |
| SF0476 #03 Y:2015 | 03 | 2015 | Reschedule plant operations or reduce load to avoid peaks | $5,817 | - | |
| SF0476 #02 Y:2015 | 02 | 2015 | Reduce the pressure of compressed air to the minimum required | $8,100 | $280 | |
| SF0476 #01 Y:2015 | 01 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,871 | - | |
| LM0118 #04 Y:2006 | 04 | 2006 | Upgrade controls on compressors | $5,931 | - | |
| LM0118 #03 Y:2006 | 03 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,104 | $425 | |
| LM0118 #02 Y:2006 | 02 | 2006 | Utilize higher efficiency lamps and/or ballasts | $969 | $2,578 | |
| LM0118 #01 Y:2006 | 01 | 2006 | Train operators for maximum operating efficiency | $8,571 | $10,004 | |
| LM0091 #07 Y:2004 | 07 | 2004 | Move product using mechanical means | $16,875 | $1,600 | |
| LM0091 #06 Y:2004 | 06 | 2004 | Develop standard procedures to improve internal yields | $16,875 | $2,150 | |
| LM0091 #05 Y:2004 | 05 | 2004 | Replace existing equipment with more suitable substitutes | $8,750 | $200 | |
| LM0091 #04 Y:2004 | 04 | 2004 | Re-arrange equipment layout to reduce labor costs | $28,000 | $1,260 | |
| LM0091 #03 Y:2004 | 03 | 2004 | Repair and eliminate steam leaks | $764 | $240 | |
| LM0091 #02 Y:2004 | 02 | 2004 | Install / repair insulation on steam lines | $1,029 | $683 | |
| LM0091 #01 Y:2004 | 01 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $709 | $300 |